HP 6125XLG R2306-HP 6125XLG Blade Switch FCoE Command Reference - Page 92
Table 28, Command output, Fabric is being built.
View all HP 6125XLG manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 92 highlights
20:00:00:05:30:00:18:db(0xfffcd7) 20:00:00:05:30:00:18:db(0xfffcd7) 20:00:00:0b:46:00:02:82(0xfffcd5) Fctracert completed. Table 28 Command output Field Route present for press CTRL_C to break 20:00:00:0b:46:00:02:82 0xfffcd5 Fctracert uncompleted. Service is unavailable. Description Path from source to destination. During the execution of the command, press Ctrl+C to abort the FC tracert operation. WWN value. Domain controller address FFFCxx of the switch, where xx is the domain ID of the switch. The FC tracert operation fails to be completed for the following possible reasons: • Resource is not enough. • Max hops reached. • Fabric is being built. • No route to destination port. • Destination port is not in fabric. • Destination port and source port are not in the same zone. The FC tracert service is not started, or internal processing fails. 87