HP Color LaserJet 9500 Service Manual - Page 56
Power-on sequence, Multifunction finisher, 000-sheet stapler/stacker, 000-sheet stacker
View all HP Color LaserJet 9500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 56 highlights
Power-on sequence Multifunction finisher The multifunction finisher performs an initialization procedure when it receives the Recovery Initialize signal. This signal is transmitted from the printer at power-on. The power-on sequence consists of the following actions: 1 Moves slide: The booklet bin slide motor (M10) drives the slide to move from the standby position. The slide returns to the standby position when the home position is detected. 2 Folding action: The staple-fold motor (M7) drives one cycle of folding action. 3 Moves swing guide vertically: The paddle motor (M2) drives the swing guide to move vertically. 4 Rotates paddler: The paddle motor (M2) drives the paddle to complete one cycle of rotation. 5 Moves stapler: The slide motor (M8) drives the stapler to move from the standby position. The stapler returns to the standby position when detecting the home position. 6 Performs alignment: The front aligning plate motor (M4) and the back aligning plate motor (M5) drive the front and back aligning plates to perform one cycle of alignment. 7 Moves stack-feed roller vertically: The transfer motor (M1) reverses, causing the upper stack-feed roller to move vertically. 8 Moves delivery tray vertically: The shift motor (M6) drives the stacker bin (bin 1) to move from the home position. The stacker bin returns to the home position when it is detected by the full loading sensor (P124). 9 Rotates ejector mechanism: The delivery motor (M3) drives the delivery belt to complete one cycle of rotation after the stacker bin has descended approximately 25 mm (1 inch). The stacker bin then returns to the home position. 3,000-sheet stapler/stacker When the 3,000-sheet stapler/stacker is turned on, or a door is opened or closed, the 3,000sheet stapler/stacker completes the initialization routines as follows: ● Initialization in parallel for the paper path, the accumulator, the stack-holder/tray, and the carriage. ● When the accumulator initialization is complete, the flipper will initialize. After a successful power-on sequence, the error light is green. If the power-on sequence is not successful, a jam condition or a hardware malfunction is indicated through the printer control panel, and the error light is amber. 3,000-sheet stacker When the stacker is turned on, or a door is opened and closed, the stacker completes the initialization in parallel for the paper path, the flipper, the offset module, and the tray. After a successful power-on sequence, the error light is green. If the power-on sequence is not successful, a jam condition or a hardware malfunction is indicated through the printer control panel, and the error light is amber. 54 Theory of operation ENWW