HP StorageWorks 2/140 director product manager user guide - Page 190

Periodic Date/Time, in Switch Binding.

Page 190 highlights

Information and Error Messages Table A-1: Product Manager Messages (Continued) Message Device applications should be terminated before starting diagnostics. Press NEXT to continue. [device WWN] cannot be removed from the Switch Membership List while participating in Switch Binding. The device must be isolated from the switch, or Switch Binding deactivated before it can be removed. Director clock alert mode must be cleared before enabling period synchronization. Description Port diagnostics (loopback tests) cannot be performed on a port while an attached device application is running. User attempted to remove a device WWN from the Switch Membership List (SANtegrity feature) while Switch Binding is enabled. Clock alert mode is enabled through the Configure FICON Management Server dialog box and user is attempting to enable Periodic Date/Time Synchronization through the Configure Date and Time dialog box. Action Terminate the device application and perform diagnostics again. Remove the device from the switch by blocking the port, setting the switch offline, or disabling Switch Binding through the Switch Binding Change State dialog box before removing devices from the Switch Membership List. Disable clock alert mode through the Configure FICON Management Server dialog box. A-12 director product manager user guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244

A–12
director product manager user guide
Information and Error Messages
Device applications
should be
terminated before
starting
diagnostics. Press
NEXT to continue.
Port diagnostics
(loopback tests)
cannot be performed
on a port while an
attached device
application is
running.
Terminate the device
application and perform
diagnostics again.
[device WWN]
cannot be removed
from the Switch
Membership List
while participating
in Switch Binding.
The device must be
isolated from the
switch, or Switch
Binding deactivated
before it can be
removed.
User attempted to
remove a device
WWN from the
Switch Membership
List
(SANtegrity
feature) while Switch
Binding is enabled.
Remove the device from the
switch by blocking the port,
setting the switch offline, or
disabling Switch Binding
through the
Switch Binding
Change State
dialog box
before removing devices from
the
Switch Membership
List
.
Director clock alert
mode must be
cleared before
enabling period
synchronization.
Clock alert mode is
enabled through the
Configure FICON
Management Server
dialog box and user is
attempting to enable
Periodic Date/Time
Synchronization
through the
Configure Date and
Time
dialog box.
Disable clock alert mode
through the
Configure
FICON Management Server
dialog box.
Table A–1:
Product Manager Messages
(Continued)
Message
Description
Action