HP StorageWorks MSA2012i HP StorageWorks 2000 Modular Smart Array Reference Gu - Page 131

Deleting a Task, Creating a Schedule, In the Task Details panel, click Delete Task.

Page 131 highlights

■ Include modified data ■ Last copy created, if the task has run ■ Error message, if any Deleting a Task You can delete an unscheduled task. If the task is scheduled, you must delete the schedule first. To delete a task: 1. Select Manage > Scheduler > Manage Scheduler. 2. In the Tasks panel click a task name. 3. In the Task Details panel, click Delete Task. 4. Click OK to confirm the operation or Cancel to stop it. Creating a Schedule To schedule a task: 1. Select Manage > Scheduler > Manage Scheduler. 2. In the Schedules panel click Add New Schedule. The Create Schedule panel is displayed. 3. Specify the date when the schedule should start running. Either: ■ Type a date using the format mm/dd/yyyy ■ Click to display a calendar window in which you can select the date The default is the current date. 4. Specify the time when the schedule should start running. The default is the current time. 5. Enable and configure recurrence and constraint rules: ■ Every - Specifies how often the task should run. ■ Between - Specifies a time range within which the task should run. Chapter 3 Managing Storage 131

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313
  • 314
  • 315
  • 316
  • 317
  • 318
  • 319
  • 320
  • 321
  • 322
  • 323
  • 324
  • 325
  • 326
  • 327
  • 328
  • 329
  • 330

Chapter 3
Managing Storage
131
Include modified data
Last copy created, if the task has run
Error message, if any
Deleting a Task
You can delete an unscheduled task. If the task is scheduled, you must delete the
schedule first.
To delete a task:
1.
Select Manage > Scheduler > Manage Scheduler.
2.
In the Tasks panel click a task name.
3.
In the Task Details panel, click Delete Task.
4.
Click OK to confirm the operation or Cancel to stop it.
Creating a Schedule
To schedule a task:
1.
Select Manage > Scheduler > Manage Scheduler.
2.
In the Schedules panel click Add New Schedule.
The Create Schedule panel is displayed.
3.
Specify the date when the schedule should start running. Either:
Type a date using the format
mm/dd/yyyy
Click
to display a calendar window in which you can select the date
The default is the current date.
4.
Specify the time when the schedule should start running.
The default is the current time.
5.
Enable and configure recurrence and constraint rules:
Every – Specifies how often the task should run.
Between – Specifies a time range within which the task should run.