Hamilton Beach 29881 Use & Care - Page 11

Timetable for Cycles

Page 11 highlights

840194101 ENv01.qxd:Layout 1 7/30/10 8:38 AM Page 11 Timetable for Cycles The display timer will count down time for the various steps in each cycle as indicated below. This is the total processing time and does not include time added for a Delayed Start. Cycle Basic French Gluten-Free Quick Sweet 1.5-lb. Express 2.0-lb. Express Dough Jam Cake Whole Grain Bake 1.5 lb. 2 lb. 1.5 lb. 2 lb. 1.5 lb. 2 lb. 1.5 lb. 2 lb. 1.5 lb. 2 lb. Start of First Kneading 2:53 3:00 3:40 3:50 3:32 3:40 1:40 2:50 2:55 :58 :58 1:30 2:50 2:55 3:00 Start of First Dough Rise 2:44 2:50 3:24 3:32 3:23 3:30 1:33 2:40 2:45 :46 :49 1:10 2:40 2:40 2:45 Indicator Beep to ADD Ingredients Start of Second Kneading 2:24 2:24 2:30 2:30 2:44 2:44 2:52 2:52 2:58 2:58 3:05 3:05 N/A 1:28 2:35 2:35 2:40 2:40 N/A N/A N/A N/A N/A N/A 1:20 total cycle 2:35 2:35 2:00 2:00 2:05 2:05 Start of Second Dough Rise 2:10 2:15 2:25 2:30 2:40 2:45 N/A 2:15 2:20 N/A N/A :40 2:15 1:55 2:00 Start of Third Dough Rise 1:45 1:50 1:55 2:00 2:05 2:10 N/A 1:45 1:50 N/A N/A N/A 1:45 1:30 1:35 Start of Bake 1:00 1:05 1:05 1:10 :55 1:00 1:20 :50 1:00 :35 :40 N/A 1:10 :50 :55 1:00 Keep Warm (60 Minutes) Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes No No Yes Yes Yes Yes 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92

11
Timetable for Cycles
The display timer will count down time for the various steps in each cycle as
indicated below. This is the total processing time and does not include time
added for a Delayed Start.
Cycle
Basic
1.5 lb.
2 lb.
French
1.5 lb.
2 lb.
Gluten-Free
1.5 lb.
2 lb.
Quick
Sweet
1.5 lb.
2 lb.
1.5-lb. Express
2.0-lb. Express
Dough
Jam
Cake
Whole Grain
1.5 lb.
2 lb.
Bake
Start of
First
Kneading
2:53
3:00
3:40
3:50
3:32
3:40
1:40
2:50
2:55
:58
:58
1:30
2:50
2:55
3:00
Start of
First
Dough
Rise
2:44
2:50
3:24
3:32
3:23
3:30
1:33
2:40
2:45
:46
:49
1:10
2:40
2:40
2:45
Indicator
Beep to ADD
Ingredients
2:24
2:30
2:44
2:52
2:58
3:05
N/A
2:35
2:40
N/A
N/A
N/A
2:35
2:00
2:05
Start of
Second
Kneading
2:24
2:30
2:44
2:52
2:58
3:05
1:28
2:35
2:40
N/A
N/A
N/A
1:20 total cycle
2:35
2:00
2:05
Start of
Second
Dough
Rise
2:10
2:15
2:25
2:30
2:40
2:45
N/A
2:15
2:20
N/A
N/A
:40
2:15
1:55
2:00
Start of
Third
Dough
Rise
1:45
1:50
1:55
2:00
2:05
2:10
N/A
1:45
1:50
N/A
N/A
N/A
1:45
1:30
1:35
Start of
Bake
1:00
1:05
1:05
1:10
:55
1:00
1:20
:50
1:00
:35
:40
N/A
1:10
:50
:55
1:00
Keep Warm
(60 Minutes)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
Yes
Yes
Yes
840194101 ENv01.qxd:Layout 1
7/30/10
8:38 AM
Page 11