Brother International PR670E Operation Manual - Page 217
Oiling the needle bars
View all Brother International PR670E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 217 highlights
Put a drop of oil onto the hook. e APPENDIX ■ Oiling the needle bars From embroidering screen, select one needle bar at a time. (Refer to page 56 for needle bar screen). Turn the handwheel counterclockwise bringing the needle bar to its lowest position. Put one drop of oil, as high as possible on the needle bar above the felt washer. Front angle view Side view 1 Punch a small hole in oil bottle. 2 Apply oil here. • Use a pointed object to punch a small hole in the tip of the included oiler before using it. Touch f screen. appeared in the following The race backs to its original position. After oiling, insert the bobbin case into the g hook, and then close the hook cover. (Refer to page 34.) 1 Apply oil here. • Too much oil may drip onto sewing project. Note • Put a drop of oil onto the hook once a day before use. • Apply one drop of oil on the lower needle bar above the felt washer every 40 - 50 hours of sewing time. • Apply only sewing machine oil. Use of any other type of oil may result in damage to the 7 embroidery machine. • Do not apply too much oil. Fabric or thread may get contaminated. If too much oil is applied, wipe off any excess with a rag. • If the thread breaks while sewing or the operating noise of the hook becomes loud, apply oil onto the race hook. 215