HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 13

Installation Time Schedule, Leader and one HP Scitex Customer Engineer CE

Page 13 highlights

Installation Time Schedule The optimal time required for installing the HP Scitex FB10000 Industrial Press system is 10 working days: 1st week - Leader and one HP Scitex Customer Engineer (CE) 2nd week - Leader and Application Specialist This is based on the assumption that all system parts have been delivered in proper working order, and that all site preparation and planning requirements have been met and completed, in accordance with the specifications and recommendations provided in this guide. Chapter 1 - Introduction 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

Chapter 1 - Introduction
5
Installation Time Schedule
The optimal time required for installing the HP Scitex FB10000 Industrial Press
system is
10
working days:
1st week
- Leader and one HP Scitex Customer Engineer (CE)
2nd week
- Leader and Application Specialist
This is based on the assumption that all system parts have been delivered in proper
working order, and that all site preparation and planning requirements have been
met and completed, in accordance with the specifications and recommendations
provided in this guide.