Unloading the Main Machine Frame Crate Note Prior to arrival, mark the final position for the FB10000 using masking tape. The main machine frame crate is typically delivered on a flatbed truck, as shown in Figure 5-9. Figure 5-9 Flatbed Truck Delivering the Main Machine Frame Crate To unload the main machine frame crate: 1 Lift the main machine frame crate from the flatbed truck using a crane with a steel beam, straps, and chains, as shown in Figure 5-4 on page 63. The specifications for the beam, straps, and chains are described in Table 5-1 on page 61. Strap in wider hole FRONT Strap in wider hole Figure 5-10 Lifting the Main Machine Crate with a Steel Beam and Straps Note The main machine frame crate can also be removed using a heavy-duty forklift, as shown on page 64. 2 Carefully place the crate on a flat surface. The crane can place the machine on the ground (if the machine is unpacked outdoors) or inside the building (if the machine is unpacked indoors). 66 HP Scitex FB10000 Site Preparation Guide, Rev. 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

66
HP Scitex FB10000 Site Preparation Guide, Rev. 2
Unloading the Main Machine Frame Crate
Note
Prior to arrival, mark the final position for the FB10000 using masking tape.
The main machine frame crate is typically delivered on a flatbed truck, as shown in
Figure 5-9
.
Figure 5-9
Flatbed Truck Delivering the Main Machine Frame Crate
To unload the main machine frame crate:
1
Lift the main machine frame crate from the flatbed truck using a crane with a
steel beam, straps, and chains, as shown in
Figure 5-4 on page 63
. The
specifications for the beam, straps, and chains are described in
Table 5-1
on
page 61.
Figure 5-10
Lifting the Main Machine Crate with a Steel Beam and Straps
Note
The main machine frame crate can also be removed using a heavy-duty forklift, as shown
on page 64.
2
Carefully place the crate on a flat surface. The crane can place the machine on the
ground (if the machine is unpacked outdoors) or inside the building (if the
machine is unpacked indoors).
FRONT
Strap in
wider hole
Strap in
wider hole