HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 17
Pneumatic and Extraction Requirements, Environmental Requirements, Hz: 3-phase 480 V, 400 V or
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Table 2-1 Summary of Site Preparation Specifications Site protection (amperage) • 50 Hz: Printing unit: 75A, UV system: 90 A • 60 Hz: Printing unit: 75A, UV system: 80 A See Electrical Requirements on page 28. Voltages • 50 Hz: 3-phase 400 V (-5% /+10%) • 60 Hz: 3-phase 480 V, 400 V or 208 V (-5% /+10%) See Electrical Requirements on page 28. Voltage spikes +5% or -10% See Power Line Disturbances on page 36. Transformer Step-up or step-down transformer See Connecting the Mains on (55 kVA) needed for sites that require page 35. 60 Hz, according to national authority electrical regulations. Pneumatic and Extraction Requirements Air compressor • Operating pressure: 7-8 bar (101.5-117.6 psi) See Air Compressor Requirements on page 39. • Minimum flow rate: 1200 liters/ min. (43 CFM) • Filtration: 5 microns • Reservoir size: 400 liters (106 gal.) Air dryer • Operating pressure: 7-8 bar (101.5-117.6 psi) • Minimum flow rate: 1200 liters/ min. (43 CFM) • Dew point: 2°C (35.6°F) See Air Dryer Requirements on page 39. Maximum tube/hose lengths • Vacuum pump to machine: 15 m (49 ft.) • Bridge outlet to UV extraction inlet: 10 m (33 ft.) • UV extraction outlet to site extraction system: 10 m (33 ft.) See Positioning Peripheral Components on page 25. Environmental Requirements Lighting According to local regulations. See Lighting on page 39. Sunlight must be filtered to block 99.97% of UV light. Artificial sources of light should not have spectral peaks below 400 nm. Recommended lighting is fluorescent lights with plastic covers. Metal halide lighting should be replaced with fluorescent lighting or filtered accordingly. Chapter 2 - Customer Responsibilities 9