HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 53

Ventilation and Fume Extraction, Exhaust Fan

Page 53 highlights

Ventilation and Fume Extraction Exhaust Fan To prevent the accumulation of hazardous vapors, the customer is responsible for providing and installing a suitable ventilation/fume extraction system for the FB10000 press and its surrounding area. The basic ventilation requirements for the FB10000 are shown in Figure 4-15. Figure 4-15 FB10000 Ventilation and Fume Extraction Requirements The requirements shown in Figure 4-15 are based on an area of 14 m x 7 m x 4 m (46 ft. x 23 ft. x 13 ft.) surrounding the FB10000. The customer should consult with a local ventilation/fume extraction specialist who will use these requirements to build a system to meet the ventilation requirements particular to the customer site. Note The personnel required to complete the necessary arrangements and connections for ventilation and fume extraction should be available in time for the 2nd day of installation. Chapter 4 - Site Planning 45

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

Chapter 4 - Site Planning
45
Ventilation and Fume Extraction
Exhaust Fan
To prevent the accumulation of hazardous vapors, the customer is responsible for
providing and installing a suitable ventilation/fume extraction system for the
FB10000 press and its surrounding area.
The basic ventilation requirements for the FB10000 are shown in
Figure 4-15
.
Figure 4-15
FB10000 Ventilation and Fume Extraction Requirements
The requirements shown in
Figure 4-15
are based on an area of 14 m x 7 m x 4 m (46
ft. x 23 ft. x 13 ft.) surrounding the FB10000.
The customer should consult with a local ventilation/fume extraction specialist who
will use these requirements to build a system to meet the ventilation requirements
particular to the customer site.
Note
The personnel required to complete the necessary arrangements and connections for ventilation
and fume extraction should be available in time for the 2nd day of installation.