Site Readiness Checklist, General Access & Site Readiness, Requirement, Guidelines, Customer Site
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 84 highlights
Site Readiness Checklist HP Customer Engineers should fill out the following checklist when conducting the site survey with the customer. Table A-1 Site Readiness Checklist General Access & Site Readiness Requirement Customer received the Site Preparation Guide? Dock type Guidelines Passageway width Passageway height Unloading location (minimum 244 cm/96") (minimum 250 cm/98.4") Route clearance Ceiling height (minimum 350 cm/138") Is the floor made of smooth concrete? Can you drill into the floor? Floor strength Floor condition On what floor of the site will the (e.g. ground floor, basement, press be installed? 2nd floor, etc.) Unloader pit required? Power/Lighting Requirements Customer Site Y / N • Ground level • Truck height • Ramp • No dock • Inside • Outside • Good • Needs to be cleared Y / N Y / N Good / Bad Good / Bad Y / N Requirement Volts Amps Is a transformer required? Transformer KVA Guidelines Customer Site Y / N 76 HP Scitex FB10000 Site Preparation Guide, Rev. 2