HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 5
FB10000 Site Preparation Guide, Rev. 2\r
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Revision History The following table briefly describes the major changes in the HP Scitex FB10000 Site Preparation Guide since the initial release in October 2013. Revision 2 - June 2014 Updated the Site Preparation Specifications Summary on page 8. Removed note about attaching an extraction pipe to the unified cooler on page 13. Made major revisions to Electrical Requirements on page 28. Added new section about Connecting the Mains on page 35. Made major revisions to ambient lighting requirements in Lighting on page 39. Added temperature and humidity requirements for machine peripherals in Temperature and Humidity on page 40. Added new section about Handling Substrates on page 41. Added instructions regarding the temperature around the unified cooler in Heat Dissipation on page 42. Removed option to connect extraction pipe to the outlet on top of the unified cooler on page 42. Updated the description of the silencer for the UV extractor on page 47. Removed GMG from the list of supported RIP Applications on page 49. Updated the table in Unloader Pit Specifications on page 54. Added new section about the Lift Release Handle on page 57 for the unloader lift. Added new section about Lifting the Main Machine Frame Crate with a Forklift on page 64. Added new section about Returning the Shipping Brackets on page 72. Added item about drilling into the floor to the Site Readiness Checklist on page 76. Revised the FB10000 Layout on page 78 to include space requirements for a possible future upgrade to the HP Scitex 15000 Corrugated Press. Preface iii