HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 34

Protecting Pipes and Cables, FB10000 Layout, Storage Area for, Consumables and Substrates

Page 34 highlights

Table 4-5 Maximum Recommended Length - Pipes & Hoses Connection Maximum Length Details UV extraction fan outlet to 15 m (49 ft.) customer site extraction system 250 mm (10") diameter, galvanized steel, terminated at least 5 m (16.4 ft.) above head height, up to three 90º bends. The pressure drop should be less than 1.5 mBar (0.02 psi) with a flow rate of 1500 m3/hr. (883 CFM). Note: The customer is responsible for completing this connection. • A suggested floor plan for operation and service access around the HP Scitex FB10000 Industrial Press system is shown in FB10000 Layout on page 78. It is essential to check that your intended location is suitable for this floor plan. If you have any doubts, consult your local Installation Manager. • In addition to the print production area, extra space will be required in a separate area for the storage of inks and substrates, as described in Storage Area for Consumables and Substrates on page 41. Protecting Pipes and Cables It is the customer's responsibility to protect the pipes and cables that connect the external components to the HP Scitex FB10000 Industrial Press with a secure, metal cover (height: 170 mm/6.7 in.). Alternatively, the customer may place the cables in a channel dug into the floor of the site. The channel must be covered properly to prevent a safety hazard. Figure 4-2 Covering the Inlet Pipes and Cables 26 HP Scitex FB10000 Site Preparation Guide, Rev. 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

26
HP Scitex FB10000 Site Preparation Guide, Rev. 2
A suggested floor plan for operation and service access around the HP Scitex
FB10000 Industrial Press system is shown in
FB10000 Layout
on page 78. It is
essential to check that your intended location is suitable for this floor plan. If you
have any doubts, consult your local Installation Manager.
In addition to the print production area, extra space will be required in a separate
area for the storage of inks and substrates, as described in
Storage Area for
Consumables and Substrates
on page 41.
Protecting Pipes and Cables
It is the customer’s responsibility to protect the pipes and cables that connect the
external components to the HP Scitex FB10000 Industrial Press with a secure, metal
cover (height: 170 mm/6.7 in.).
Alternatively, the customer may place the cables in a channel dug into the floor of
the site. The channel must be covered properly to prevent a safety hazard.
Figure 4-2
Covering the Inlet Pipes and Cables
UV extraction fan outlet to
customer site extraction system
15 m (49 ft.)
250 mm (10") diameter, galvanized steel,
terminated at least 5 m (16.4 ft.) above head
height, up to three 90º bends.
The pressure drop should be less than 1.5 mBar
(0.02 psi) with a flow rate of 1500 m
3
/hr. (883
CFM).
Note
: The customer is responsible for
completing this connection.
Table 4-5
Maximum Recommended Length — Pipes & Hoses
Connection
Maximum Length
Details