HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 78
from the pallet., top of the bolts to release the machine. The machine is then ready to be lifted
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 78 highlights
6 Repeat steps 1 through 5 to remove the other half of the crate. Caution Do not climb on top of the crate. Use ladders. 7 Carefully cut and remove the protective wrapping from the machine. 8 There are 6 bolts that secure the machine to the pallet. Remove the nuts from the top of the bolts to release the machine. The machine is then ready to be lifted from the pallet. Figure 5-15 Removing Securing Bolts from Pallet 9 Attach 3.5 m (11.5 ft.) straps to the eyebolts on the far side of the chassis. (The correct length can be achieved by attaching short straps to standard 3 m [9.8 ft.] straps, as shown in Figure 5-16.) 3 m (9.8 ft.) straps 0.5 m (1.6 ft.) straps Figure 5-16 Attaching Straps to Eyebolts 70 HP Scitex FB10000 Site Preparation Guide, Rev. 2