HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 68

General, Delivery Instructions

Page 68 highlights

General This document provides machine delivery and rigging information for the HP Scitex FB10000 Industrial Press. Please read the instructions carefully prior to the delivery and unloading of the HP Scitex FB10000 Industrial Press. HP representatives supervise the unloading, unpacking, transfer and placement of the FB10000 at its final destination, and carry out the installation process. Delivery Instructions It is the customer's responsibility to order a qualified rigging company to carry out the unloading, opening, and unpacking of the HP Scitex FB10000 Industrial Press and all its peripheral components. It is the responsibility of the rigging company, in coordination with the customer, to provide the equipment required to carry out this process, as described in Required Tools and Equipment on page 61. The system should be delivered to certified HP service engineers/installers, unless otherwise notified by the local Installation Leader. The rigging company should assist HP Scitex personnel in unpacking the equipment. This procedure typically takes the first day of installation to complete. Note Do not unload and/or unpack the crates without the presence and approval of the HP Engineer/ Installer. The HP Scitex FB10000 Industrial Press (including accessories and media) is delivered to the customer site in multiple crates. For the dimensions and weights of each crate, see Table 4-2 on page 21. The largest crate, which contains the machine's main frame and loader, is typically delivered on an open flatbed truck. The rest of the crates arrive in a closed truck with a box trailer. Note The delivering, unloading, and conveying of the HP Scitex FB10000 Industrial Press should be performed by a minimum of four people provided by the rigging company. 60 HP Scitex FB10000 Site Preparation Guide, Rev. 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

60
HP Scitex FB10000 Site Preparation Guide, Rev. 2
General
This document provides machine delivery and rigging information for the HP Scitex
FB10000 Industrial Press.
Please read the instructions carefully prior to the delivery and unloading of the HP
Scitex FB10000 Industrial Press. HP representatives supervise the unloading,
unpacking, transfer and placement of the FB10000 at its final destination, and carry
out the installation process.
Delivery Instructions
It is the customer’s responsibility to order a qualified rigging company to carry out
the unloading, opening, and unpacking of the HP Scitex FB10000 Industrial Press
and all its peripheral components. It is the responsibility of the rigging company, in
coordination with the customer, to provide the equipment required to carry out this
process, as described in
Required Tools and Equipment
on page 61.
The system should be delivered to certified HP service engineers/installers, unless
otherwise notified by the local Installation Leader.
The rigging company should assist HP Scitex personnel in unpacking the equipment.
This procedure typically takes the first day of installation to complete.
Note
Do not unload and/or unpack the crates without the presence and approval of the HP Engineer/
Installer.
The HP Scitex FB10000 Industrial Press (including accessories and media) is
delivered to the customer site in multiple crates. For the dimensions and weights of
each crate, see
Table 4-2
on page 21.
The largest crate, which contains the machine’s main frame and loader, is typically
delivered on an open flatbed truck. The rest of the crates arrive in a closed truck with
a box trailer.
Note
The delivering, unloading, and conveying of the HP Scitex FB10000 Industrial Press should be
performed by a minimum of four people provided by the rigging company.