Table A-1 Site Readiness Checklist Is the mains power supply connected? Are power outlets installed? Is there a connection to ground? Pneumatic Requirements Y / N Y / N Y / N Requirement Guidelines Is there an air compressor? Air compressor type Size of air tank (liters) Is there an air dryer? Does the air dryer achieve 43 CFM? Is there sufficient space for the vacuum pump & piping? Is there an extraction hose for the UV system? Environmental Requirements Customer Site Y / N Piston / Screw Y / N Y / N Y / N Y / N Requirement Guidelines Customer Site Are light sources filtered to block No radiation peaks below UV light? 400 nm. UV light from windows blocked by 99.97%. Site temperature 17-30°C/63-86°F Site humidity 50-60% Rh Temperature controller type • HVAC • AC • Heater • Other • None Is an air extraction system available? 1300 m3/hr. (765 CFM) in the area surrounding the press Are sufficient fresh air exchanges available? According to the customer's ventilation specialist (1800 m3/hr. [1059 CFM] in the area surrounding the press) Y / N Y / N Y / N Chapter A - Additional Information 77

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89

Chapter A - Additional Information
77
Is the mains power supply
connected?
Y
/
N
Are power outlets installed?
Y
/
N
Is there a connection to ground?
Y
/
N
Pneumatic Requirements
Requirement
Guidelines
Customer Site
Is there an air compressor?
Y
/
N
Air compressor type
Piston
/
Screw
Size of air tank (liters)
Is there an air dryer?
Y
/
N
Does the air dryer achieve
43 CFM?
Y
/
N
Is there sufficient space for the
vacuum pump & piping?
Y
/
N
Is there an extraction hose for the
UV system?
Y
/
N
Environmental Requirements
Requirement
Guidelines
Customer Site
Are light sources filtered to block
UV light?
No radiation peaks below
400 nm. UV light from windows
blocked by 99.97%.
Y
/
N
Site temperature
17-30
°
C/63-86
°
F
Site humidity
50-60% Rh
Temperature controller type
HVAC
AC
Heater
Other
None
Is an air extraction system
available?
1300 m
3
/hr. (765 CFM) in the
area surrounding the press
Y
/
N
Are sufficient fresh air exchanges
available?
According to the customer’s
ventilation specialist (1800 m
3
/hr.
[1059 CFM] in the area
surrounding the press)
Y
/
N
Table A-1
Site Readiness Checklist