HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 85
Pneumatic Requirements, Requirement, Guidelines, Customer Site, Environmental Requirements
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 85 highlights
Table A-1 Site Readiness Checklist Is the mains power supply connected? Are power outlets installed? Is there a connection to ground? Pneumatic Requirements Y / N Y / N Y / N Requirement Guidelines Is there an air compressor? Air compressor type Size of air tank (liters) Is there an air dryer? Does the air dryer achieve 43 CFM? Is there sufficient space for the vacuum pump & piping? Is there an extraction hose for the UV system? Environmental Requirements Customer Site Y / N Piston / Screw Y / N Y / N Y / N Y / N Requirement Guidelines Customer Site Are light sources filtered to block No radiation peaks below UV light? 400 nm. UV light from windows blocked by 99.97%. Site temperature 17-30°C/63-86°F Site humidity 50-60% Rh Temperature controller type • HVAC • AC • Heater • Other • None Is an air extraction system available? 1300 m3/hr. (765 CFM) in the area surrounding the press Are sufficient fresh air exchanges available? According to the customer's ventilation specialist (1800 m3/hr. [1059 CFM] in the area surrounding the press) Y / N Y / N Y / N Chapter A - Additional Information 77