HP Scitex FB10000 Site Preparation Guide Rev. 2 - Page 52
Table 4-16, The noise levels at a particular site are dependent on site conditions
View all HP Scitex FB10000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
Figure 4-14 shows the layout that was used to perform the measurements provided in Table 4-16. The noise levels at a particular site are dependent on site conditions and the precise layout of FB10000 components at the site. UV Cabinet Vacuum Pump 1000mm. UV Extraction 3 1680mm. 2140mm. 4 LEC 5 Bridge Loader / Unloader REC Unified Cooler 1700mm. 1 Figure 4-14 Layout Used for Measured Noise Levels Loading Table 2 44 HP Scitex FB10000 Site Preparation Guide, Rev. 2
44
HP Scitex FB10000 Site Preparation Guide, Rev. 2
Figure 4-14
shows the layout that was used to perform the measurements provided
in
Table 4-16
. The noise levels at a particular site are dependent on site conditions
and the precise layout of FB10000 components at the site.
Figure 4-14
Layout Used for Measured Noise Levels
LEC
Bridge
Loader / Unloader
REC
Loading Table
Vacuum
Pump
Unified
Cooler
UV
Extraction
UV
Cabinet
1700mm.
1000mm.
2140mm.
1680mm.
3
4
5
1
2