HP d640 HP D640 High-Volume Printer - Installation Manual (Printer and Accesso - Page 135

Table 4-1, HCI Parts Checklist, Parts Included with HCI

Page 135 highlights

Procedure 1: High-Capacity Input (HCI) Installation 4. Remove the foam blocks and plastic from the HCI. 5. Open the HCI door and remove all packing materials inside the HCI. 6. Save the packing materials; in the future you may need to use them to pack the HCI for shipment. The HCI box contains the parts required to set up the HCI (see Figure 4-3). Check the contents of the HCI box to make sure you have all of the components listed in Table 4-1, "HCI Parts Checklist". Table 4-1 HCI Parts Checklist Paper guide 1 Support stand 1 Support mounting bracket 1 Paper guide Support stand Support mounting bracket Figure 4-3 Parts Included with HCI 4-6 Accessories (2) Leveling chains

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210

Procedure 1: High-Capacity Input (HCI) Installation
4-6
Accessories
4.
Remove the foam blocks and plastic from the HCI.
5.
Open the HCI door and remove all packing materials inside the HCI.
6.
Save the packing materials; in the future you may need to use them to pack the HCI
for shipment.
The HCI box contains the parts required to set up the HCI (see Figure 4-3). Check the con-
tents of the HCI box to make sure you have all of the components listed in Table 4-1,
“HCI Parts Checklist”.
Table 4-1
HCI Parts Checklist
Figure 4-3
Parts Included with HCI
Paper guide
1
Support stand
1
Support mounting bracket
1
Paper guide
(2) Leveling chains
Support stand
Support
mounting bracket