HP d640 HP D640 High-Volume Printer - Installation Manual (Printer and Accesso - Page 15

The Installation Process, Required Tools

Page 15 highlights

The Installation Process The Installation Process The installation process is broken down into a number of key procedures, each of which contains several different activities concentrated in a particular physical location of the printer. The procedures covered in this chapter include: • Procedure 1: Identifying the Printer Installation Boxes, on page 2-7 • Procedure 2: Opening the Starter Kit, on page 2-9 • Procedure 3: Unpacking the Printer, on page 2-12 • Procedure 4: Getting To Know Your Printer, on page 2-21 • Procedure 5: Inside the Front Door, on page 2-25 • Procedure 6: Installing Ozone Filter and Manual Pocket, on page 2-39 • Procedure 7: Removing Paper Tray Packing Material, on page 2-41 • Procedure 8: Powering On the Printer, on page 2-43 • Procedure 9: Adding New Supplies, on page 2-47 • Procedure 10: Setting the Paper Trays, on page 2-60 • Procedure 11: Installing Function Code, on page 2-71 • Procedure 12: Setting the Date and Time, on page 2-76 • Procedure 13: Printing a Setup Report, on page 2-79 • Procedure 14: Securing the Printer, on page 2-82 • Procedure 15: Paper Path Alignment, on page 2-83 Once you have completed these procedures, the printer will be up and running as a standalone unit. Save packing materials for repacking later, if necessary. Required Tools You will need the following additional tools for installation: • Pliers to remove plastic lock inserts. • Cutter to remove plastic strapping material. • #2 Phillips screwdriver (if you are installing Memory, HCI or HCO). • Medium flat blade screwdriver (if you are installing an HCO). NOTE: Move the printer close to its final location before unpacking. Make sure you have room to lower the ramp before moving the printer off of the pallet. 2-6 Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210

The Installation Process
2-6
Installation
The Installation Process
The installation process is broken down into a number of key procedures, each of which
contains several different activities concentrated in a particular physical location of the
printer. The procedures covered in this chapter include:
Procedure 1: Identifying the Printer Installation Boxes, on page 2-7
Procedure 2: Opening the Starter Kit, on page 2-9
Procedure 3: Unpacking the Printer, on page 2-12
Procedure 4: Getting To Know Your Printer, on page 2-21
Procedure 5: Inside the Front Door, on page 2-25
Procedure 6: Installing Ozone Filter and Manual Pocket, on page 2-39
Procedure 7: Removing Paper Tray Packing Material, on page 2-41
Procedure 8: Powering On the Printer, on page 2-43
Procedure 9: Adding New Supplies, on page 2-47
Procedure 10: Setting the Paper Trays, on page 2-60
Procedure 11: Installing Function Code, on page 2-71
Procedure 12: Setting the Date and Time, on page 2-76
Procedure 13: Printing a Setup Report, on page 2-79
Procedure 14: Securing the Printer, on page 2-82
Procedure 15: Paper Path Alignment, on page 2-83
Once you have completed these procedures, the printer will be up and running as a standa-
lone unit.
Save packing materials for repacking later, if necessary.
Required Tools
You will need the following additional tools for installation:
Pliers to remove plastic lock inserts.
Cutter to remove plastic strapping material.
#2 Phillips screwdriver (if you are installing Memory, HCI or HCO).
Medium flat blade screwdriver (if you are installing an HCO).
NOTE:
Move the printer close to its final location before unpacking. Make sure
you have room to lower the ramp before moving the printer off of the
pallet.