Brother International HL-2600CN Service Manual - Page 199
Sequence of Replacement
View all Brother International HL-2600CN manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 199 highlights
Sequence of Replacement 1) Lift the transfer roller 2 lock levers at both sides (right & left) to the arrow direction A. (Fig.6-25) 2) Holding the lock levers at both sides, pull them upwards to remove the transfer roller 2. Transfer roller 2 Fig.6-24 3) Install a new transfer roller 2 into the printer. i) Prepare a new transfer roller 2. ii) Hold the lock levers at both sides and align both ends of the shaft to the slit on the transfer base. iii) Push the transfer roller 2 shaft into the slit and place the bearing of the roller onto the spring. Ensure that the spring is not bent as shown in Fig. 6-25. iv)Fix the transfer roller 2 by pulling down the lock levers at both sides to the arrow direction B. Lock lever A B Spring Proper assembly Fig.6-25 Wrong assembly VI-28