IBM 7979B1U User Manual - Page 71
enablement
View all IBM 7979B1U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 71 highlights
Hook-and-loop fastener SCSI terminator SCSI signal cable SCSI adapter connector Tape drive connector SCSI adapter connector Terminator Power cable Tape drive connector To install a SCSI tape drive in a 3.5-inch model server, complete the following steps: 1. Read the safety information that begins on page vii and "Installation guidelines" on page 28. 2. Turn off the server and peripheral devices, and disconnect the power cords and all external cables. Attention: In a dc power environment, only trained service personnel other than IBM service technicians are authorized to connect or disconnect power to the dc power supply. See the documentation that comes with each dc power supply. 3. If you have not attached the space filler from the tape enablement kit to the tape-drive assembly, do so now. 4. Remove the server cover. 5. Remove the fan-bracket assembly. 6. Remove the filler panels from the two bottom-left hard disk drive bays. Chapter 2. Installing optional devices 55