IBM 7379E2U User Manual - Page 110
the bay until it is seated.
View all IBM 7379E2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
Hot-swap fan Fan air baffle Note: Replace a hot-swap fan within 30 seconds of removal. Attention: Static electricity that is released to internal server components when the server is powered-on might cause the server to halt, which could result in the loss of data. To avoid this potential problem, always use an electrostatic-discharge wrist strap or other grounding system when working inside the server with the power on. 9. Remove the power-supply filler from the second power-supply bay. 10. Slide the new power supply partially into the empty power-supply bay. Pinch the orange release latch and push the power supply the rest of the way into the bay until it is seated. 11. Install the left-side cover (see "Completing the installation" on page 96). 12. Connect one end of the new power cord into the connector on the back of power supply, and connect the other end of the power cord to a properly grounded electrical outlet. 94 IBM System x3400 M3 Type 7378/7379: Installation and User's Guide