IBM 7379E2U User Manual - Page 73
Reconnect the external cables and power cords; then, turn on the attached
View all IBM 7379E2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
Power-supply cage Power-supply cage handle Power-supply cage front latch bracket Locating tabs Notch Locating tabs 3. Rotate the power-supply cage handle down until the handle tip engages the notch in the front latch bracket; then, lower the handle until it locks in place. Power supply cage closed 4. Install and lock the left-side cover (see "Completing the installation" on page 96). 5. Install the hot-swap power supplies. 6. Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server. Chapter 2. Installing optional devices 57
Power-supply
cage handle
Power-supply cage
Power-supply cage
front latch bracket
Locating tabs
Locating tabs
Notch
3.
Rotate the power-supply cage handle down until the handle tip engages the
notch in the front latch bracket; then, lower the handle until it locks in place.
Power supply
cage closed
4.
Install and lock the left-side cover (see “Completing the installation” on page
96).
5.
Install the hot-swap power supplies.
6.
Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Chapter 2. Installing optional devices
57