IBM 7379E2U User Manual - Page 67
Removing the air baffle, Unlatch the power-supply cage and rotate it out of the server until it locks.
View all IBM 7379E2U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 67 highlights
Removing the air baffle To remove the air baffle, complete the following steps: 1. Read the safety information that begins on page vii and "Installation guidelines" on page 28. 2. Turn off the server and all attached devices. 3. Disconnect all external cables and power cords. 4. Remove the left-side cover (see "Removing the left-side cover" on page 48 for more information). 5. Remove the power supplies from the power-supply cage. 6. Unlatch the power-supply cage and rotate it out of the server until it locks. 7. Rotate the rear of the air baffle up 1 . Find the pinch tab on the air baffle, pinch it together with your fingers 2 , and lift the air baffle out of the server 3. Chapter 2. Installing optional devices 51
Removing the air baffle
To remove the air baffle, complete the following steps:
1.
Read the safety information that begins on page vii and “Installation guidelines”
on page 28.
2.
Turn off the server and all attached devices.
3.
Disconnect all external cables and power cords.
4.
Remove the left-side cover (see “Removing the left-side cover” on page 48 for
more information).
5.
Remove the power supplies from the power-supply cage.
6.
Unlatch the power-supply cage and rotate it out of the server until it locks.
7.
Rotate the rear of the air baffle up
±1²
. Find the pinch tab on the air baffle,
pinch it together with your fingers
±2²
, and lift the air baffle out of the server
±3²
.
Chapter 2. Installing optional devices
51