Sharp AR M550N Installation Manual - Page 32

Ar-f15/f16 Unpacking And, Installation

Page 32 highlights

[4] AR-F15/F16 UNPACKING AND INSTALLATION 1. Unpacking When removing or moving, be sure to perform by two persons not to drop the unit. A. Unpacking procedure (1) Removal of the main unit 1) Remove the fixing member and remove the top case. 4) Hold the upper section of the machine with two persons, and pull it up and stand it straight. (The machine is very heavy. Be careful.) 5) Remove the tape and the skid. 2) Remove the packaged parts from the add. 6) Remove the upper add. 3) Check the packaged parts. 1 2 3 5 6 4 7 8 Packaged parts 1 Positioning pin 2 Earth plate 3 Earth mounting plate 4 Rail mounting plate 1 pc. 1 pc. 1 pc. 1 pc. 5 Staple label 6 Screw G (M4 x 6) 7 Screw H (M4 x 10) 8 Screw I (M4 x 18) 2 pcs. 3 pcs. 2 pcs. 4 pcs. AR-M550/M620/M700 INSTALLATION MANUAL (AR-F15/F16) 4 - 1

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60

AR-M550/M620/M700
INSTALLATION MANUAL
(AR-F15/F16)
4 - 1
[4]
AR-F15/F16 UNPACKING AND
INSTALLATION
1. Unpacking
When removing or moving, be sure to perform by two persons not to
drop the unit.
A.
Unpacking procedure
(1)
Removal of the main unit
1)
Remove the fixing member and remove the top case.
2)
Remove the packaged parts from the add.
3)
Check the packaged parts.
Packaged parts
4)
Hold the upper section of the machine with two persons, and pull it
up and stand it straight.
(The machine is very heavy. Be careful.)
5)
Remove the tape and the skid.
6)
Remove the upper add.
1
Positioning pin
1 pc.
5
Staple label
2 pcs.
2
Earth plate
1 pc.
6
Screw G (M4 x 6)
3 pcs.
3
Earth mounting plate
1 pc.
7
Screw H (M4 x 10)
2 pcs.
4
Rail mounting plate
1 pc.
8
Screw I (M4 x 18)
4 pcs.
1
2
5
6
3
4
8
7