Dell PowerConnect J-SRX210 Hardware Guide - Page 62
Table 19: Site Preparation Checklist for the J-SRX210 Services Gateway, Installation, Notes, Performed
View all Dell PowerConnect J-SRX210 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 62 highlights
PowerConnect J-SRX210 Services Gateway Hardware Guide Table 19: Site Preparation Checklist for the J-SRX210 Services Gateway Installation (continued) Item or Task Performed Additional Information By Date Notes • Measure distance between external power sources and device installation site. • Locate sites for connection of system grounding. • Calculate the power consumption and requirements. "J-SRX210 Services Gateway Site Electrical Wiring Guidelines" on page 143 "J-SRX210 Services Gateway Power Specifications and Requirements" on page 144 Rack Installation • Verify that your rack meets the minimum requirements. • Plan rack location, including required space clearances. • Secure the rack to the floor and building structure. "J-SRX210 Services Gateway Rack Requirements" on page 49 Cabinet Installation • Verify that your cabinet meets the minimum requirements. • Plan the cabinet location, including required space clearances. Wall Installation "J-SRX210 Services Gateway Cabinet Requirements" on page 48 • Verify that the area selected meets the minimum requirements. • Verify that you have the required hardware to proceed with the installation. "Preparing the J-SRX210 Services Gateway for Wall-Mount Installation" on page 64 Desktop Installation • Verify that the area selected meets the minimum requirements. • Plan the installation location, including required space clearances and airflow requirements. Cables "Preparing the J-SRX210 Services Gateway for Desk-Mount Installation" on page 63 46