Dell PowerConnect J-SRX210 Hardware Guide - Page 65

J-SRX210 Services Gateway Rack Requirements, Table 21: Rack Requirements for the Services Gateway

Page 65 highlights

Chapter 7: Preparing the Site for the J-SRX210 Services Gateway Installation • Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway on page 50 J-SRX210 Services Gateway Rack Requirements The services gateway can be installed in a rack. Many types of racks are acceptable, including front-mount racks and four-post (telco) racks. NOTE: The services gateway does not support center-mount racks. Table 21 on page 49 provides the details on rack size, clearance, and airflow requirements. Table 21: Rack Requirements for the Services Gateway Rack Requirements Specifications Rack Size A 19 in. (48.3 cm) rack as defined in Cabinets, Racks, Panels, and Associated Equipment (document number EIA-310-D) published by the Electronics Industry Association (http://www.eia.org). Rack Requirements • The outer edges of the mounting brackets extend the width of either chassis to 19 in. (48.3 cm). • The front of the chassis extends approximately 0.5 in. (1.27 cm) beyond the mounting ears. • Maximum permissible ambient temperature when two devices are placed side by side in a 19 in. rack is 40ο C. • In a rack, two devices should be placed in alternate slots and not adjacent. NOTE: If you use a front-mount rack, we recommend you support the back of the device with a shelf or other structure. Spacing of Mounting Bracket and Flange Holes • The holes within each rack set are spaced at 1 U [1.75 in. (4.5 cm)]. The device can be mounted in any rack that provides holes or hole patterns spaced at 1-U [1.75 in. (4.5 cm)] increments. • The mounting brackets and front-mount flanges used to attach the chassis to a rack are designed to fasten to holes spaced at rack distances of 1 U (1.75 in.). • The mounting holes in the mounting brackets provided with the device are spaced 1.25 in. (3.2 cm) apart (top and bottom mounting hole). Connecting to the Building Structure Always secure the rack in which you are installing the services gateway to the structure of the building. If your geographical area is subject to earthquakes, bolt the rack to the floor. For maximum stability, also secure the rack to ceiling brackets. Related Topics • General Site Guidelines for Installing the J-SRX210 Services Gateway on page 47 • Site Preparation Checklist for the J-SRX210 Services Gateway on page 45 • J-SRX210 Services Gateway Cabinet Requirements on page 48 • Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway on page 50 49

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182

Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210
Services Gateway on page 50
J-SRX210 Services Gateway Rack Requirements
The services gateway can be installed in a rack. Many types of racks are acceptable,
including front-mount racks and four-post (telco) racks.
NOTE:
The services gateway does not support center-mount racks.
Table 21 on page 49 provides the details on rack size, clearance, and airflow requirements.
Table 21: Rack Requirements for the Services Gateway
Specifications
Rack Requirements
A 19 in. (48.3 cm) rack as defined in
Cabinets, Racks, Panels, and Associated Equipment
(document
number EIA-310-D) published by the Electronics Industry Association (
).
Rack Size
The outer edges of the mounting brackets extend the width of either chassis to 19 in. (48.3
cm).
The front of the chassis extends approximately 0.5 in. (1.27 cm) beyond the mounting ears.
Maximum permissible ambient temperature when two devices are placed side by side in a 19
in. rack is 40
ο
C.
In a rack, two devices should be placed in alternate slots and not adjacent.
NOTE: If you use a front-mount rack, we recommend you support the back of the device with a
shelf or other structure.
Rack Requirements
The holes within each rack set are spaced at 1 U [1.75 in. (4.5 cm)]. The device can be mounted
in any rack that provides holes or hole patterns spaced at 1-U [1.75 in. (4.5 cm)] increments.
The mounting brackets and front-mount flanges used to attach the chassis to a rack are
designed to fasten to holes spaced at rack distances of 1 U (1.75 in.).
The mounting holes in the mounting brackets provided with the device are spaced 1.25 in. (3.2
cm) apart (top and bottom mounting hole).
Spacing of Mounting
Bracket and Flange Holes
Always secure the rack in which you are installing the services gateway to the structure of the
building. If your geographical area is subject to earthquakes, bolt the rack to the floor. For maximum
stability, also secure the rack to ceiling brackets.
Connecting to the Building
Structure
Related Topics
General Site Guidelines for Installing the J-SRX210 Services Gateway on page 47
Site Preparation Checklist for the J-SRX210 Services Gateway on page 45
J-SRX210 Services Gateway Cabinet Requirements on page 48
Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210
Services Gateway on page 50
49
Chapter 7: Preparing the Site for the J-SRX210 Services Gateway Installation