Dell PowerConnect J-SRX210 Hardware Guide - Page 66

Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway

Page 66 highlights

PowerConnect J-SRX210 Services Gateway Hardware Guide Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway When planning the installation site for the J-SRX210 Services Gateway, you need to allow sufficient clearance around the rack or cabinet where you are planning to install the device. When planning the installation site for the services gateway, consider the following: • For the cooling system to function properly, the airflow around the chassis must be unrestricted. • For service personnel to remove and install hardware components, there must be adequate space at the front and back of the device. Allow at least 24 in. (61 cm) both in front of and behind the device. • If you are mounting the device in a rack with other equipment, or if you are placing it on the desktop near other equipment, ensure that the exhaust from other equipment does not blow into the intake vents of the chassis. Table 22 on page 50 provides information on the clearance requirements for maintaining the optimum airflow and the distances for facilitating easy maintenance of the device. Table 22: Clearance Requirements for the Services Gateway Location Recommended Clearance Requirement for Clearance Front of the chassis Rear of the chassis 2.5 in. (6.35 cm) 2.5 in. (6.35 cm) Space for service personnel to remove and install hardware components NOTE: More space is required for installing and removing Mini-PIMs. Space for service personnel to remove and install hardware components Between front-mounting flange and rack 2.5 in. (6.35 cm) or cabinet edge Space for cable management and organization Between side of the chassis and any non-heat-producing surface such as a wall or cabinet side 2.5 in. (6.35 cm) Space for the cooling system to function properly and to maintain unrestricted airflow around the chassis Between side of the chassis and devices 2.5 in. (6.35 cm) that have fans or blowers Space for the cooling system to function properly and to maintain unrestricted airflow around the chassis Related Topics • J-SRX210 Services Gateway Description on page 3 • General Site Guidelines for Installing the J-SRX210 Services Gateway on page 47 • Site Preparation Checklist for the J-SRX210 Services Gateway on page 45 • J-SRX210 Services Gateway Cabinet Requirements on page 48 50

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182

Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210
Services Gateway
When planning the installation site for the J-SRX210 Services Gateway, you need to allow
sufficient clearance around the rack or cabinet where you are planning to install the
device.
When planning the installation site for the services gateway, consider the following:
For the cooling system to function properly, the airflow around the chassis must be
unrestricted.
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the device. Allow at least 24 in. (61 cm) both
in front of and behind the device.
If you are mounting the device in a rack with other equipment, or if you are placing it
on the desktop near other equipment, ensure that the exhaust from other equipment
does not blow into the intake vents of the chassis.
Table 22 on page 50 provides information on the clearance requirements for maintaining
the optimum airflow and the distances for facilitating easy maintenance of the device.
Table 22: Clearance Requirements for the Services Gateway
Requirement for Clearance
Recommended Clearance
Location
Space for service personnel to remove and
install hardware components
NOTE: More space is required for installing and
removing Mini-PIMs.
2.5 in. (6.35 cm)
Front of the chassis
Space for service personnel to remove and
install hardware components
2.5 in. (6.35 cm)
Rear of the chassis
Space for cable management and organization
2.5 in. (6.35 cm)
Between front-mounting flange and rack
or cabinet edge
Space for the cooling system to function
properly and to maintain unrestricted airflow
around the chassis
2.5 in. (6.35 cm)
Between side of the chassis and any
non-heat-producing surface such as a
wall or cabinet side
Space for the cooling system to function
properly and to maintain unrestricted airflow
around the chassis
2.5 in. (6.35 cm)
Between side of the chassis and devices
that have fans or blowers
Related Topics
J-SRX210 Services Gateway Description on page 3
General Site Guidelines for Installing the J-SRX210 Services Gateway on page 47
Site Preparation Checklist for the J-SRX210 Services Gateway on page 45
J-SRX210 Services Gateway Cabinet Requirements on page 48
50
PowerConnect J-SRX210 Services Gateway Hardware Guide