Dell PowerConnect J-SRX210 Hardware Guide - Page 78

Preparing the J-SRX210 Services Gateway for Rack-Mount Installation

Page 78 highlights

PowerConnect J-SRX210 Services Gateway Hardware Guide Preparing the J-SRX210 Services Gateway for Rack-Mount Installation You can mount a J-SRX210 Services Gateway on four-post (telco) racks, enclosed cabinets, and open-frame racks. NOTE: The J-SRX210 Services Gateway does not support center-mount racks. Table 27 on page 62 provides the list of tasks you need to perform before installing the device. Table 27: J-SRX210 Services Gateway Preinstallation Checklist for Rack-Mount Installation Task Additional Information Verify that the site meets the requirements. "Site Preparation Checklist for the J-SRX210 Services Gateway" on page 45 Verify that the racks or cabinets meet the specific "J-SRX210 Services Gateway Rack requirements. Requirements" on page 49 Place the rack or cabinet in its permanent location, allowing adequate clearance for airflow and maintenance, and secure it to the building structure. "Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway" on page 50 Remove the services gateway chassis from the shipping carton. "Unpacking the J-SRX210 Services Gateway" on page 57 Verify that you have the following parts available in your rack-mounting kit for the J-SRX210 Services Gateway: • Rack-mounting brackets • Screws • Power supply adapter tray with screws Adjust the power supply adapter tray. "Adjusting the Power Supply Adapter Tray for J-SRX210 Services Gateway" on page 66 NOTE: The rack-mounting kit is not shipped with the device and must be ordered separately. Related Topics • Site Preparation Checklist for the J-SRX210 Services Gateway on page 45 • Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210 Services Gateway on page 50 • Unpacking the J-SRX210 Services Gateway on page 57 62

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182

Preparing the J-SRX210 Services Gateway for Rack-Mount Installation
You can mount a J-SRX210 Services Gateway on four-post (telco) racks, enclosed
cabinets, and open-frame racks.
NOTE:
The J-SRX210 Services Gateway does not support center-mount racks.
Table 27 on page 62 provides the list of tasks you need to perform before installing the
device.
Table 27: J-SRX210 Services Gateway Preinstallation Checklist for
Rack-Mount Installation
Additional Information
Task
“Site Preparation Checklist for the J-SRX210
Services Gateway” on page 45
Verify that the site meets the requirements.
“J-SRX210 Services Gateway Rack
Requirements” on page 49
Verify that the racks or cabinets meet the specific
requirements.
“Clearance Requirements for Airflow and
Hardware Maintenance of the J-SRX210
Services Gateway” on page 50
Place the rack or cabinet in its permanent location,
allowing adequate clearance for airflow and
maintenance, and secure it to the building
structure.
“Unpacking the J-SRX210 Services Gateway”
on page 57
Remove the services gateway chassis from the
shipping carton.
Verify that you have the following parts available
in your rack-mounting kit for the J-SRX210 Services
Gateway:
Rack-mounting brackets
Screws
Power supply adapter tray with screws
“Adjusting the Power Supply Adapter Tray
for J-SRX210 Services Gateway” on page 66
Adjust the power supply adapter tray.
NOTE:
The rack-mounting kit is not shipped with the device and must be ordered
separately.
Related Topics
Site Preparation Checklist for the J-SRX210 Services Gateway on page 45
Clearance Requirements for Airflow and Hardware Maintenance of the J-SRX210
Services Gateway on page 50
Unpacking the J-SRX210 Services Gateway on page 57
62
PowerConnect J-SRX210 Services Gateway Hardware Guide