English If the period of continuous lock is less than 5 minutes, the SBAS-corrected position may be more accurate. When recording a job for post-processing, the receiver records GPS measurements the entire time the job is open - not just when you're recording data into a feature. Therefore, you do not need to record each feature for more than 20 minutes. Each feature has to be recorded during a portion of the job file where you maintained lock on the satellites for at least 20 minutes. If you open a job, open a point feature 19 minutes later, record the point feature for 60 seconds and close the feature and the job, the feature will be recorded during a period lasting 20 minutes and you should have sub-meter accuracy. For this reason, it is best to open the job as soon as you are in a position to maintain constant satellite lock and close it more than 20 minutes later. 68

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86

English
68
If the period of continuous lock is less than 5 minutes, the
SBAS-corrected position may be more accurate.
When recording a job for post-processing, the receiver records
GPS measurements the entire time the job is open – not just
when you’re recording data into a feature.
Therefore, you do not need to record each feature for more
than 20 minutes. Each feature has to be recorded during a
portion of the job file where you maintained lock on the satel-
lites for at least 20 minutes.
If you open a job, open a point feature 19 minutes later,
record the point feature for 60 seconds and close the feature
and the job, the feature will be recorded during a period last-
ing 20 minutes and you should have sub-meter accuracy.
For this reason, it is best to open the job as soon as you are in
a position to maintain constant satellite lock and close it more
than 20 minutes later.