Brother International Innov-is XJ1 Operation Manual - Page 132

Attaching The Embroidery, Frame

Page 132 highlights

ATTACHING THE EMBROIDERY FRAME ATTACHING THE EMBROIDERY FRAME Note • Wind embroidery bobbin thread and insert the bobbin before attaching the embroidery frame. Check that there is enough thread in the bobbin. a Press (Presser foot lifter button) to raise the presser foot. b Align the embroidery frame guide of the embroidery frame holder. with the right edge ■ Removing the Embroidery Frame a Press presser (Presser foot. foot lifter button) to raise the b Raise the frame-securing lever. c Pull the embroidery frame toward you. 1 Embroidery frame holder 2 Embroidery frame guide c Slide the embroidery frame into the holder, making sure to align the embroidery frame's with the holder's . 1 Arrow mark d Lower the frame-securing lever to be level with frame to secure the embroidery frame in the the embroidery frame holder. 1 Frame-securing lever 130

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212

ATTACHING THE EMBROIDERY FRAME
130
a
Press
(Presser foot lifter button) to raise the
presser foot.
b
Align the embroidery frame guide with the right edge
of the embroidery frame holder.
1
Embroidery frame holder
2
Embroidery frame guide
c
Slide the embroidery frame into the holder, making
sure to align the embroidery frame’s
with the
holder’s
.
1
Arrow mark
d
Lower the frame-securing lever to be level with the
frame to secure the embroidery frame in the
embroidery frame holder.
1
Frame-securing lever
Removing the Embroidery Frame
a
Press
(Presser foot lifter button) to raise the
presser foot.
b
Raise the frame-securing lever.
c
Pull the embroidery frame toward you.
ATTACHING THE EMBROIDERY
FRAME
Note
Wind embroidery bobbin thread and insert the
bobbin before attaching the embroidery frame.
Check that there is enough thread in the bobbin.