Cisco SGE2000 Configuration Guide - Page 23

Back Panel, Information About Checking the Shipping Container Contents - replacement

Page 23 highlights

Chapter 2 Introduction to the SCE Platform Information About The SCE Platform Back Panel The SCE 2000 platform back-panel contains the following components: • Two field-replaceable power supply units with ON/OFF switches • A field-replaceable fan drawer • Ground connections • Two connectors to the external bypass module The rear panels of both the AC- and DC-powered SCE 2000 platforms are shown in the following pair of figures. Figure 2-2 SCE 2000 Back Panel: AC Power 1 BYPASS 2 BYPASS 1 IN POWER B OK IN POWER A OK 92760 4 3 2 Figure 2-3 SCE 2000 Back Panel: DC Power BYPASS 2 BYPASS 1 IN POWER B OK IN POWER A OK 210432 Information About Checking the Shipping Container Contents Use the SCE 2000 Component List to check the contents of the SCE 2000 platform shipping container. Do not discard the shipping container. You need the container if you move or ship the SCE 2000 platform in the future. • SCE 2000 Component List OL-7824-06 Cisco SCE 2000 4xGBE Installation and Configuration Guide 2-5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142

2-5
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-06
Chapter 2
Introduction to the SCE Platform
Information About The SCE Platform
Back Panel
The
SCE 2000
platform back-panel contains the following components:
Two field-replaceable power supply units with ON/OFF switches
A field-replaceable fan drawer
Ground connections
Two connectors to the external bypass module
The rear panels of both the AC- and DC-powered
SCE 2000
platforms are shown in the following pair
of figures.
Figure 2-2
SCE 2000 Back Panel: AC Power
Figure 2-3
SCE 2000 Back Panel: DC Power
Information About Checking the Shipping Container Contents
Use the
SCE 2000
Component List to check the contents of the
SCE 2000
platform shipping container.
Do not discard the shipping container. You need the container if you move or ship the
SCE 2000
platform
in the future.
SCE 2000 Component List
BYPASS 2
IN
POWER B
OK
IN
POWER A
OK
BYPASS 1
1
2
3
4
92760
BYPASS 2
IN
POWER B
OK
IN
POWER A
OK
BYPASS 1
210432