Cisco SGE2000 Configuration Guide - Page 25

SCE 2000 Installation Checklist, Required passwords, IP - reviews

Page 25 highlights

Chapter 2 Introduction to the SCE Platform Information About The SCE Platform SCE 2000 Installation Checklist To assist you with your installation and to provide a historical record of what was done by whom, photocopy the following SCE 2000 Installation Checklist. Indicate when each procedure or verification is completed. When the checklist is completed, place it in your site log along with the other records for your new SCE 2000 platform. Table 2-5 SCE 2000 Installation Checklist Task Verified By Date Date SCE 2000 received SCE 2000 and all accessories unpacked Safety recommendations and guidelines reviewed Topology verified: number of SCE 2000 platforms, number of links, and whether inline or receive-only Installation Checklist copied Site log established and background information entered Site power voltages verified Site environmental specifications verified Required passwords, IP addresses, device names, and so on, needed for initial configuration available Required tools available Network connection equipment available SCE 2000 mounted in rack (optional) AC/DC power cables connected to AC/DC sources and SCE 2000 platform Console port set for 9600 baud, 8 data bits, no parity, and 1 stop bit (9600 8N1) ASCII terminal attached to console port FE management ports are operational GBE line and cascade ports operational OL-7824-06 Cisco SCE 2000 4xGBE Installation and Configuration Guide 2-7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142

2-7
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-06
Chapter 2
Introduction to the SCE Platform
Information About The SCE Platform
SCE 2000 Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom,
photocopy the following
SCE 2000
Installation Checklist. Indicate when each procedure or verification
is completed. When the checklist is completed, place it in your site log along with the other records for
your new
SCE 2000
platform.
Table 2-5
SCE 2000 Installation Checklist
Task
Verified By
Date
Date
SCE 2000
received
SCE 2000
and all accessories
unpacked
Safety recommendations and
guidelines reviewed
Topology verified: number of
SCE 2000
platforms, number of
links, and whether inline or
receive-only
Installation Checklist copied
Site log established and
background information entered
Site power voltages verified
Site environmental
specifications verified
Required passwords, IP
addresses, device names, and so
on, needed for initial
configuration available
Required tools available
Network connection equipment
available
SCE 2000
mounted in rack
(optional)
AC/DC power cables connected
to AC/DC sources and
SCE 2000
platform
Console port set for 9600 baud, 8
data bits, no parity, and 1 stop bit
(9600 8N1)
ASCII terminal attached to
console port
FE management ports are
operational
GBE line and cascade ports
operational