Cisco SGE2000 Configuration Guide - Page 93
Cabling the Line Ports and Completing the Installation, Connecting the line ports to the network
![]() |
View all Cisco SGE2000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 93 highlights
6 C H A P T E R Cabling the Line Ports and Completing the Installation This chapter provides instructions for cabling the Gigabit Ethernet ports for both one and two SCE 2000 topologies, and for configuring Gigabit Ethernet (GBE) interface parameters. In a topology utilizing two SCE 2000 s (cascade), this includes the cascade ports as well as the line ports. Note When installing a cascaded system, it is extremely important to follow the sequence of procedures outlined in the section How to Install a Cascaded System. Note When installing an External Optical Bypass module, the SCE 2000 line ports are connected to the module. Refer to How to Cable the External Optical Bypass Module for complete instructions. • Connecting the line ports to the network • Information About Cascaded Systems • How to Load and Activate a Service Control Application Connecting the line ports to the network • Cabling Diagrams • How to Configure the GBE Interface Parameters • How to Cable the GBE Line Interface Ports • Testing Connectivity: Examining Link LEDs and Counters to Verify that the Network Traffic is Reaching the Device • What to Do Next Cabling Diagrams Before beginning, find the appropriate cabling diagram for the topology in your installation: • Single SCE 2000 topologies - Single Link: Inline Topology OL-7824-06 Cisco SCE 2000 4xGBE Installation and Configuration Guide 6-1
![](/manual_guide/products/cisco-slm2024tna-configuration-guide-b7fffba/93.png)