Cisco SGE2000 Configuration Guide - Page 90
How to Verify Management Interface Connectivity, DETAILED STEPS, SUMMARY STEPS
![]() |
View all Cisco SGE2000 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 90 highlights
Connecting the Management Interface Chapter 5 Connecting the Management Interfaces and Performing Initial System Configuration DETAILED STEPS Step 1 Take the Ethernet cable provided (with attached RJ-45 connector) and plug it into the desired MNG port on the front panel of the SCE 2000 , as shown in the following figure. Figure 5-2 Cabling the Management Port 92791 12 MNG 1 MNG 2 ALCITNIKV/E101/010000/ ALCITNIKV/E101/010000/ CONSOLE AUX 3 PWR A PWR B STATUS BYPASS LINK RX TX LINK RX TX RX MM TX RX MM TX GBE-1 SUB LINE NET Cisco S4CxEG2B0E00 Series LINK RX TX LINK RX TX RX MM TX RX MM TX GBE-2 SUB LINE/CASCADE NET Step 2 Connect the other end of the Ethernet cable into your management network. • If only one management port is used - connect the port directly to the LAN. • If both management ports are used - connect both ports to the LAN via a switch. Make sure that you push on the RJ-45 connector attached to the cable until you hear a click, which indicates that the connector is fully inserted and secured in the receptacle. Gently pull on the plug to confirm whether the plug is locked into the socket. If the Link LED on the SCE 2000 management port does not light, try removing the cable and reinserting it firmly into the module socket. To disconnect the plug from the socket, press down on the raised portion on top of the plug, releasing the latch. You should hear an audible click indicating the latch has released. Carefully pull the plug out of the socket. If the management port Link LED on the SCE 2000 still does not light, verify that the cable is connected correctly to the appropriate network element on its second end. How to Verify Management Interface Connectivity If the SCE 2000 platform has been powered up, test now to verify that connectivity has been established between the SCE 2000 and the remote management host. If the SCE 2000 platform is not powered up, perform this step after starting the SCE 2000 platform. SUMMARY STEPS 1. After you connect the cable to the appropriate Mng port and to your network, check the relevant Mng port LEDS. 2. Test connectivity. From the host that you intend to use for remote management, ping to the SCE 2000 by typing ping and the SCE 2000 IP address, and pressing Enter (see the example, below). 5-26 Cisco SCE 2000 4xGBE Installation and Configuration Guide OL-7824-06
![](/manual_guide/products/cisco-slm2024tna-configuration-guide-b7fffba/90.png)