IBM 847651U Handbook - Page 186
Completing the installation, Attention, What to do next?, To allow for air circulation
![]() |
UPC - 087944496366
View all IBM 847651U manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 186 highlights
Completing the installation 7. If you have a modem or fax machine attached to the server, and you are not in the United Kingdom, reconnect the telephone line to the wall outlet and the server, and plug the power cords into properly grounded electrical outlets. If you are in the United Kingdom, plug in the power cords first; then, connect the telephone line to the wall outlet and the server. 8. Turn on the server and all attached devices. Attention: To allow for air circulation, be sure to maintain the following minimum clearances around the server: 102 mm (4 in.) in the front 127 mm (5 in.) in the rear 51 mm (2 in.) on the left and right sides What to do next? When you have completed installing the covers and cables, go to "Updating the server configuration" on page 153. 152 Netfinity 3000 User's Handbook
![](/manual_guide/products/ibm-847651u-handbook-778b46d/186.png)