Dell PowerVault 56F Dell PowerVault 51F 8-Port Fibre Channel Switch Insta - Page 117

Installing the New Switch Components, Reinstall the GBICs.

Page 117 highlights

Installing the New Switch Components 1. Install the system board. See "Installing the System Board," found earlier in this chapter for instructions. 2. Install the fan tray assembly. See "Installing a New Fan Assembly," found earlier in this chapter for instructions. 3. Replace the switch's cover. 4. Reinstall the GBICs. See "Installing a GBIC Module," found earlier in this chapter for instructions. 5. Install the power supply(s). 6. See "Installing a Power Supply," found earlier in this chapter for instructions. 7. Reconnect all external cabling. 8. Turn on the switch's power. 9. The switch automatically runs POST. 10. Check for error messages via Telnet. support.dell.com Repair and Replacement 6-9

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156

support.dell.com
Repair and Replacement
6-9
Installing the New Switch Components
1.
Install the system board.
See “Installing the System Board,” found earlier in this chapter for instructions.
2.
Install the fan tray assembly.
See “Installing a New Fan Assembly,” found earlier in this chapter for
instructions.
3.
Replace the switch’s cover.
4.
Reinstall the GBICs.
See “Installing a GBIC Module,” found earlier in this chapter for instructions.
5.
Install the power supply(s).
6.
See “Installing a Power Supply,” found earlier in this chapter for instructions.
7.
Reconnect all external cabling.
8.
Turn on the switch’s power.
9.
The switch automatically runs POST.
10.
Check for error messages via Telnet.