IBM 86624RY Maintenance Manual - Page 186
Completing the installation, Installing the top cover
UPC - 087944490654
View all IBM 86624RY manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 186 highlights
Completing the installation To complete the installation, you must reinstall the side and top covers, reconnect all the cables that you disconnected in "Preparing to install options" on page 246, and, for certain options, run the Configuration/Setup Utility program. Attention For correct cooling and airflow, install the top cover before turning on the server. Operating the server for extended periods of time (over 30 minutes) with the top cover removed might damage server components. Installing the top cover: Refer to the following illustration while you perform the steps in this procedure. 1 Thumbscrews 2 Top cover To install the server top cover: 1. Before installing a cover, check that all cables, adapters, and other components are installed and seated correctly and that you have not left loose tools or parts inside the server. 2. Lower the cover 2 with the rear edge of the cover about 25 mm (1 inch) back from the rear edge of the server. 3. Slide the cover forward. 178 Netfinity Server HMM