IBM 86624RY Maintenance Manual - Page 275
Installing the server in the rack, Move the handle up in the slots so that
UPC - 087944490654
View all IBM 86624RY manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 275 highlights
Installing the server in the rack: You will use eight screws (M4 by 8). To install the server in the rack: 1. Fully extend the slide-bracket assemblies until they lock. 2. Install the four lift handles on the sides of the server: a. Press in on the sides of the lift handle near the tabs and insert the handle tabs into the slots on the side of the server. b. Move the handle up in the slots so that the hooked part of each tab is inside the server. Release the pressure on the sides of the handle. c. Install the remaining three lift handles. 18 kg (37 lbs) 32 kg (70.5 lbs) Caution Use safe practices when lifting. 55 kg (121.2 lbs) Netfinity 5500 M20 - Type 8662 267
Installing the server in the rack:
You will use eight
screws (M4 by 8).
To install the server in the rack:
1.
Fully extend the slide-bracket assemblies until they
lock.
2.
Install the four lift handles on the sides of the server:
a.
Press in on the sides of the lift handle near the
tabs and insert the handle tabs into the slots on
the side of the server.
b.
Move the handle up in the slots so that the
hooked part of each tab is inside the server.
Release the pressure on the sides of the handle.
c.
Install the remaining three lift handles.
Caution
Use safe practices when lifting.
±
18 kg
(37 lbs)
±
32 kg
(70.5 lbs)
±
55 kg
(121.2 lbs)
Netfinity 5500 M20 - Type 8662
267