HP Cluster Platform Express v2010 Workgroup System and Cluster Platform Expres
HP Cluster Platform Express v2010 Manual
View all HP Cluster Platform Express v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
HP Cluster Platform Express v2010 manual content summary:
- HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 1
HP Cluster Platform Workgroup System and Cluster Platform Express Overview and Hardware Installation Guide HP Part Number: A-CPCPE-1E Published: February 2009 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 2
contained herein is subject to change without notice. The only warranties for HP products and services are set forth in the express warranty statements accompanying such products and services. Nothing herein should be construed as constituting an additional warranty. HP shall not be liable - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 3
Table of Contents About This Document...9 Intended Audience...9 Document Organization...9 Typographic Conventions...10 Related Information...10 HP Encourages Your Comments...10 1 Cluster Platform Express Overview 11 1.1 Cluster Platform Workgroup System 11 1.2 CPE BladeSystem with c7000 Enclosure - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 4
3 CPE BladeSystem with c7000 Enclosure Configurations 43 3.1 CPE c7000 Configuration Examples 43 3.1.1 Server Blade Configuration Example with Three Enclosures in a 42U Rack 44 3.1.2 Server Blade Configuration Example with Two Enclosures in a 42U Rack 46 3.1.3 Server Blade Configuration Example - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 5
...120 F.2 InfiniBand Cabling Tables for Rack-Mountable Servers 121 F.2.1 Cabling Topology and Rules 121 F.2.1.1 Using the Cabling Tables 121 F.2.2 Using a Single ISR 9024 Interconnect to Support up to 24 Nodes 122 Table of Contents 5 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 6
F.2.3 Using Two ISR 9024 Interconnects to Support 25-32 Nodes 123 Index...125 6 Table of Contents - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 7
List of Figures 1-1 Zero-U Mounted Power Distribution Unit 14 1-2 Zero-U Mounted Power Distribution Unit for c7000 Configurations 15 1-3 42U Power Strip Installation in a 42U Cabinet 17 1-4 42U Power Strip Installation...18 1-5 HP GbE2c Blade Switch...19 1-6 Example InfiniBand Cable Routing for - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 8
Tables 1-1 PDUs Per Rack...16 1-2 HP GbE2c Ethernet Blade Switch for c-Class BladeSystem User and Service Documentation....20 1-3 Rack-Mountable Server Control Nodes 25 1-4 CPE Documentation for Supported Components 35 A-1 Wiring Table Key...61 B-1 CP Workgroup System with Either Single-Density or - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 9
interconnects. When ordering a cluster, you can specify installation support from HP Global Services, or complete the on-site installation procedures yourself. others. For the HP Cluster Platform Workgroup System Tower Hardware Installation Guide, go to: http://www.docs.hp.com/en/A-CPWST-1B/A-CPWST - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 10
A warning calls attention to important information that if not understood or followed will result in personal injury or nonrecoverable system problems. CAUTION: Content of the caution. Reader Cautions A caution calls attention to important information that if not understood or followed will - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 11
into a standard HP 10000 Series rack. The CP Workgroup System includes support for an Administrative, Console, and Gigabit Ethernet network, and includes an System. For the HP Cluster Platform Workgroup System Tower Hardware Installation Guide, go to: http://www.docs.hp.com/en/A-CPWST-1B/A-CPWST-1B - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 12
(HPC) by integrating servers, networks, and rack infrastructures with a choice of HPC software and services. • The HP 10000 Series 22U rack supports up to 16 rack-mount compute nodes, and the HP 10000 Series 42U rack supports up to 32 rack-mount compute nodes. • HP CPE with rack-mountable server - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 13
there is a maximum of three c7000 enclosures for a CPE BladeSystem with c7000 enclosure configuration in a 42U rack, and only one c3000 enclosure is supported in a 22U rack in the CP Workgroup System. • TFT7600 (Keyboard, Video, and Mouse) and Console Switch: An optional rack-mounted console switch - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 14
units (PDUs) that are mounted in the side of a rack and made accessible by removing the rack's side panels. Warning! To ensure safety and serviceability, do not block access to the sides of a CPE rack. Figure 1-1 shows the features of a 0U PDU used in CPE configurations. The actual location - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 15
to the side of the rack column, adjacent to the rack's side panels for servicing. 2. The rack's front left column. 3. Main inlet power cable, connected to to the power strips (see Figure 1-3). 5. Connector shield, providing support for the outlet power cables. 6. PDU main breaker switch. 7. - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 16
Table 1-1 PDUs Per Rack CPE Configuration Number of Power Supplies Installed in the c-Class Enclosure or Rack Components Number of 0U Mounted PDUs Required CP Workgroup System The c3000 enclosure is configured with up Up to two 24A PDUs are necessary to four power supplies. when an external - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 17
in the third hole from the top of the third power strip. 5. This location is the same on 22U cabinets. 6. Center cabinet support. 7. Front cabinet support with power strips attached. 1.4.3.2 Power Strips Used in Older CPE Systems As a reference for older CPE clusters, up to twelve power strips - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 18
Figure 1-4 42U Power Strip Installation 1 3 2 7 8 6 4 10 9 5 11 The following list describes the callouts shown in Figure 1-4: 1. M5 screw attached to power strip. 2. M5 screw attached to cable management bracket. 3. Power strip mounting plate. 4. Bracket attaching the power strip to the - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 19
is documented in the HP Cluster Platform Gigabit Ethernet Interconnect Guide, is used for administrative and console networking in CPE solutions for MPI applications. Cluster management on server blade configurations is supported over an administration network with both console and operating-system - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 20
Ethernet Blade Switch for c-Class BladeSystem User and Service Documentation Document Title Location GbE2c Ethernet Blade Switch for HP http://bizsupport.austin.hp.com/bc/docs/support/SupportManual/c00700745/ c-Class Quick Setup Instructions c00700745.pdf HP GbE2c Ethernet Blade Switch for - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 21
an InfiniBand fabric. For HPC configurations, Cluster Platform requires a Voltaire Grid Switch that is internally managed to provide the subnet management service. You can also use OpenSM from OpenFabric Enterprise Distribution to establish an InfiniBand fabric. 1.4 CPE Architecture Overview 21 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 22
Figure 1-7 HP 4X DDR InfiniBand Switch Module 1 2 Note: When the 4X DDR InfiniBand switch module is used in a CP Workgroup System, it is installed in module bays 3 and 4 of the HP BladeSystem c3000 enclosure. Figure 1-8 shows the new HP BLc 4X DDR InfiniBand Gen2 Switch being installed in an HP - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 23
might be necessary to remove the cable management brackets to service components installed in the rack. To remove these brackets Guide and the HP Cluster Platform 24-Node Cable Management Kit Installation Guide. 1.4.4.3 Cable Management Plate Figure 1-10 shows the cable management plate that supports - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 24
passes through the cut-out slots in the cable management plate to provide full support for a cable bundle. 4. Secure the strap by passing it through the 7 in the HP Cluster Platform InfiniBand Interconnect Installation and User's Guide. Note: You can make the connections while all the devices in - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 25
Table 1-3 Rack-Mountable Server Control Nodes HP ProLiant DLxxx Gx with Opteron Processors DL145 Gx DL165 Gx DL385 Gx HP ProLiant DLxxx Gx with Xeon Processors DL140 Gx DL160 Gx DL380 Gx Note: Rack-mountable control nodes are referred to as external control nodes and are considered an option for - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 26
and monitoring. 7. Optional redundant power supplies. 1.4.6 Connecting to an External Network An optional connection to an external 10/100/1000Base-T network is supported from the control node using NIC2. Connecting to an external network depends on the type of CPE configuration, as follows: • CP - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 27
Figure 1-12 CP Workgroup System Configuration with Single-Density Server Blade Control Node 3 1 2 4 5 The following list describes the callouts in Figure 1-12: 1. HP GbE2c switch 2. Connection from the Onboard Administrator's iLO port to the HP GbE2c port 22 3. Optional connection from a server - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 28
Note: In all configurations with a server blade as the control node, NIC2 of the server blades installed in the same enclosure as the control node will also be connected to the switch used to provide external connectivity. Cluster management software or the system administrator for the cluster must - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 29
Figure 1-14 CPE BladeSystem Configurations with a Rack-Mountable Server Control Node 11 2 3 2 8 6 12 9 4 6 1 5 10 7 6 The following list describes the callouts in Figure 1-14: 1. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1) of the first HP - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 30
10. Connection from the OA's external link to an administrative switch (HP ProCurve 2824 switch) 11. Optional connection from the control node's NIC2 port to an external network (such as a campus network) 12. Optional connection from the control node's iLO port to either an administrative switch or - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 31
1. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1) of the first HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 2. HP ProCurve 2824 switch 3. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 ( - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 32
Figure 1-16 CPE BladeSystem (c7000) Configurations with a Single-Density Server Blade Control Node 2 6 3 4 6 1 5 6 8 7 9 10 The following list describes the callouts in Figure 1-16: 1. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1) of the first HP - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 33
Note: Only one connection from each HP GbE2c switch to the HP ProCurve 2824 switch is required if the optional InfiniBand network is present. 1.4.6.6 CPE BladeSystem Configurations with Double-Density Server Blade Control Node Figure 1-17 shows a connections to an external network for configurations - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 34
is necessary to remove a cable management bracket to service a unit, reverse the installation instructions found in one of the following bracket installation guides: • HP Cluster Platform c-Class Blade Cable Management Bracket Installation Guide • HP Cluster Platform 24-Node Cable Management Bracket - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 35
switch) are supplied with your shipment. Table 1-4 CPE Documentation for Supported Components Component Document Note PDU and power distribution bars HP Cluster Platform Core Components Safety information. HP Cluster Platform Site Preparation Guide HP 10000 series racks; 22U or 42U HP Cluster - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 36
Table 1-4 CPE Documentation for Supported Components (continued) Component Document c-Class cable management bracket HP BladeSystem c-Class Enclosure Cable (used for the two c-Class Management Bracket Installation Guide InfiniBand switch modules with (436670-doc) either 8 or 16 external - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 37
network is in your configuration, all of the server blades must be connected to the InfiniBand network. The following components or features are not supported in CP Workgroup System: • External storage within the rack, such as an MSA or EVA device • Multiple c3000 enclosures (HP recommends the CPE - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 38
Note: See Appendix B for the configuration diagrams and the cabling tables for CP Workgroup System. 2.1.1 22U Cabinet with a c3000 Enclosure and an External Control Node Figure 2-1 shows a typical CP Workgroup System with one HP BladeSystem c3000 Enclosure in a 22U rack with an external control node - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 39
Guidelines for CP Workgroup System For information on how to prepare your site to install the CP Workgroup System, see the HP BladeSystem Site Planning Guide: http://h71028.www7.hp.com/enterprise/cache/499697-0-0-0-121.html 2.2 Site Preparation Guidelines for CP Workgroup System 39 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 40
described in the HP BladeSystem Site Planning Guide and the HP Cluster Platform Site Preparation Guide. See Appendix E for more information the HP BladeSystem c3000 Enclosure Quick Setup Instructions: http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01167169/c01167169.pdf CP Workgroup System - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 41
Enclosure and c3000 Tower Enclosure Maintenance and Service Guide: http://h20000.www2.hp.com/bc/docs/support/SupportManual/c01126895/c01126895.pdf For more information on post-installation and diagnostics, see the HP BladeSystem c-Class Enclosure Troubleshooting Guide: http://h20000.www2.hp.com/bc - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 42
42 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 43
Ethernet network • Configurations of one, two, or three c7000 enclosures Cluster management in CPE BladeSystem with c7000 enclosure configurations is supported over an administration network with both console and operating system-level management branches. These branches share a physical switch, but - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 44
Note: At this time, HP does not plan to support joining Cluster Platform Express for BladeSystem configurations to adjacent cabinets due to potential service issues with the 0U (side-mounted) PDUs. The following sections show CPE c7000 enclosure configuration examples in 42U and 22U cabinets: • - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 45
Figure 3-1 Server Blade Configuration Example with Three Enclosures in a 42U Rack 1 2 3 4 5 6 3 3 8 7 Figure 3-1 shows the following cluster components: 1. HP 10000 Series 42U rack. 2. Filler panels to close up any unused space on the front of the rack. 3. An HP c7000 enclosure with 16 half-height - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 46
3.1.2 Server Blade Configuration Example with Two Enclosures in a 42U Rack Figure 3-2 shows a typical CPE BladeSystem with c7000 server blade solution with two enclosures in a 42U rack. Some of the components shown in this figure might be optional, or they might be installed in a different location - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 47
3.1.3 Server Blade Configuration Example with One Enclosure in a 42U Rack Figure 3-3 shows a typical CPE BladeSystem with c7000 enclosure solution with one enclosure in a 42U rack. Some of the components shown in this figure might be optional, or they might be installed in a different location or - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 48
Note: The configurations with one c7000 enclosure with an InfiniBand interconnect might not have an external control node. If your configuration does not have an external control node, one of the server blades in the enclosure is designated as the control node. 3.1.4 Server Blade Configuration with - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 49
1D/A-CPSPG-1D.pdf. Also refer to the HP BladeSystem Site Planning Guide: http://h71028.www7.hp.com/enterprise/cache/499697-0-0-0-121.html. 3.3 pallet, follow the safety instructions described in that white paper: http://h20000.www2.hp.com/bc/docs/support/SupportManual/c00883424/c00883424.pdf - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 50
in the HP Cluster Platform Site Preparation Guide, the HP BladeSystem Site Preparation Guide, and any procedures specific to your computer the HP BladeSystem c7000 Enclosure Quick Setup Instructions: http://h20000.www2.hp.com/bc/docs/support/SupportManual/c00698534/c00698534.pdf For more information - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 51
with c7000 enclosure configurations use the Insight Management interface to troubleshoot failures. See the HP BladeSystem c7000 Enclosure Maintenance and Service Guide: http://bizsupport.austin.hp.com/bc/docs/support/SupportManual/c00714237/c00714237.pdf For more information on post-installation - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 52
Figure 3-6 Server Blade Access Through a Local KVM 4 1 3 5 6 2 The following components are shown in Figure 3-6: 1. Monitor 2. Keyboard 3. Mouse 4. Local I/O cable connected to the control node server blade 5. Half-height server blade 6. c-Class enclosure You will also need a local I/O cable to - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 53
Figure 3-7 Local I/O Cable 1 2 3 4 The I/O cable connections shown in Figure 3-7 are: 1. Server blade connector 2. Serial port 3. USB ports (2) 4. Video port 3.7 Operating System Information 53 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 54
54 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 55
4 CPE with Rack-Mountable Servers HP Cluster Platform Express rack-mountable configurations are built around a system interconnect that might be an HP ProCurve Gigabit Ethernet or a 24-port InfiniBand interconnect. Chapter 4 discusses the following topics: • CPE with rack-mountable servers - 42U - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 56
Figure 4-1 shows the following cluster components: 1. Cable management harness. 2. DLxx control node. 3. A 24-port HP ProCurve Ethernet switch, providing the cluster's administrative and console management networks. In Gigabit Ethernet clusters, such switches also provide the high-speed message- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 57
Figure 4-2 Typical 22U CPE with Rack-Mountable Servers Configuration 1 2 Tape 11 33 55 00 22 44 PCI-X 3 2 iLO 2 1 SCSI Port 1 UID 1 3 5 7 Mouse Serial A Video 2 4 6 8 Keybd DL140 G2 1 2 UID LO100i DL140 G2 1 2 UID LO100i DL140 G2 1 2 UID LO100i DL140 G2 1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 58
CPE with rack-mountable servers, see the HP Cluster Platform Site Preparation Guide: http://www.docs.hp.com/en/A-CPSPG-1D/A-CPSPG-1D.pdf 4.4 safety instructions described in the white paper: http://h20000.www2.hp.com/bc/docs/support/SupportManual/c00883424/c00883424.pdf Note: The instructions to - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 59
are also available for Linux cluster management, along with HP Insight Control Linux Edition offered in BladeSystem configurations. For more information about the supported software for CPE systems, see the HP Cluster Platform Express QuickSpecs on the HP Web site: http://h18000.www1.hp.com/products - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 60
60 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 61
A Port Labeling Syntax This appendix provides the port labeling syntax for all of the cabling tables provided in this document. Table A-1 provides the wiring table syntax for CPE configurations. Table A-1 Wiring Table Key Label String Admin ESx IB SWx Px Description Identifies a component in the - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 62
62 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 63
B CP Workgroup System Configuration Diagrams and Cabling Tables This appendix describes the following topics: • Example configuration diagrams (see Section B.1) • CP Workgroup System cabling tables (see Section B.2) B.1 Example Configuration Diagrams This section includes the following CP Workgroup - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 64
7. DVD drive 8. Compute node 6 9. Compute node 5 10. Compute node 4 11. Administrative network and system interconnect (GigE only) 12. iLO access 13. Onboard Administrator 14. LAN or direct connect 15. External File Sharing (CIFS, NFS) 16. Clients (such as HP PCs or workstations) 17. GbE2c switch - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 65
5. Compute node 1 6. Compute node 8 7. Compute node 7 8. System interconnect and Administrative network 9. Compute node 6 10. Compute node 5 11. iLO access 12. Administrative network and system interconnect 13. External File Sharing (CIFS, NFS) 14. LAN or direct connect 15. Clients such as HP - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 66
Note: Compute nodes cannot be attached to the SB40c storage blade. Figure B-3 CP Workgroup System with an SB40c Storage Blade 15 16 14 17 6 1 19 7 2 3 11 4 8 9 5 10 18 12 13 The following list describes the callouts in Figure B-3: 1. c3000 enclosure 2. Compute node 2 3. Compute node - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 67
B.1.4 CP Workgroup System with an Optional InfiniBand Interconnect Figure B-4 shows a CP Workgroup System with an optional InfiniBand interconnect. Figure B-4 CP Workgroup System with an Optional InfiniBand Interconnect 15 16 14 17 6 1 19 7 2 3 11 4 8 5 9 10 20 12 18 13 The - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 68
InfiniBand connections without using an external InfiniBand interconnect. However, at the time of this release, these configurations are not supported in a Microsoft Windows environment. Currently, if you plan to use a Microsoft Windows environment, the configuration requires an external InfiniBand - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 69
Figure B-6 c3000 Configuration with External Control Node Connection to the InfiniBand Interconnect 2 3 4 2 1 5 6 7 The following list describes the callouts shown in Figure B-6: 1. Connection from the HP 4X DDR InfiniBand Switch to the Control Node InfiniBand HCA 2. HP GbE2c switch 3. Connection - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 70
Note: Section B.2.1 also provides the administrative network wiring for a single c7000 enclosure with standard-density server blades. B.2.1 HP BladeSystem c3000 and c7000 Network Cabling Tables Table B-1 CP Workgroup System with Either Single-Density or Double-Density Server Blades and Single c7000 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 71
From Label To Label Enclosure 1 Interconnect Module 3/4 Port 7 E1-IMB3-P7 N/A N/A Enclosure 1 Interconnect Module 3/4 Port 8 E1-IMB3-P8 Control Node InfiniBand HCA Control-P1 Comment Optional External InfinBand Switch Wiring From Label To Label Comment IB 24 Port Switch Port 1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 72
72 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 73
save the configuration, as follows: >> apply >> save For more information on setting up VLANs, see the HP GbE2c Ethernet Blade Switch for c-Class BladeSystem Application Guide: http://bizsupport.austin.hp.com/bc/docs/support/SupportManual/c00701973/c00701973.pdf 73 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 74
74 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 75
D Cabling Tables for CPE BladeSystem, with c7000 Enclosure Configurations This appendix provides cabling examples and tables for CPE BladeSystem with c7000 Enclosure configurations: Network Description Section Number N/A Cabling examples for CPE BladeSystem with one or more c7000 Section D.1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 76
Note: XC needs a managed ProCurve switch in the administration network to support auto-discovery. Smaller Cluster Platform Express BladeSystem configurations that do not need an external interconnect can be manually configured. Figure D-1 shows an example of a cabling configuration for one c-Class - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 77
Figure D-1 Cabling Configuration for One c-Class Enclosure 1 2 3 6 7 10 6 11 R e m o v e m a n a g e m e n mt o d u le s b e of re e je c tin g s le e v e 15 13 5 8 12 2 4 9 14 The following list describes the callouts in Figure D-1: 1. Control node (optional). If the configuration has a - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 78
Figure D-2 Cabling Configuration for Two or More c-Class Enclosures 1 2 2 3 7 10 6 11 R e m o v e m a n a g e m e n mt o d u le s b e of re e je c tin g s le e v e 6 13 5 4 9 15 8 12 14 The following list describes the callouts in Figure D-2: 1. Control node (optional). The control node - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 79
D.2 Administrative/Console Wiring Tables for One c7000 Enclosure with Double-Density Server Blades The following table provides the Administrative and Console wiring scheme for one c7000 enclosure with double-density server blades. Connections for the external control node and external InfiniBand - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 80
Table D-3 Administrative/Console Wiring Tables for Configurations with Two or Three c7000 Enclosures with Single-Density Server Blades (continued) Origin Label Destination Label Comment ProCurve 2824 Admin-ES1-P3 Enclosure 1, IMB1, E1-IMB1-P23 Only present if interconnect is GigE Port 3 Port - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 81
D.4 Administrative/Console Wiring Tables for Two c7000 Enclosures with Double-Density Server Blades The following table provides the Administrative/Console wiring scheme for two c7000 enclosures with double-density server blades. Connections for the external control node and external InfiniBand - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 82
Table D-4 Administrative/Console Wiring Tables for Configurations with Two c7000 Enclosures with Double-Density Server Blades (continued) Origin Label Destination Label Comment ProCurve 2824 Admin-ES1-P20 Enclosure 2 OA1 Port 20 OA/iLO E3-OA1-iLO ProCurve 2824 Admin-ES1-P21 Enclosure 1 OA1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 83
From Label To Label Comment ProCurve 2848 Port 11 Not Connected ProCurve 2848 Port 12 Not Connected ProCurve 2848 Port 13 Admin-ES1-P13 Enclosure 3 Interconnect Module 1 Port 21 E3-IMB1-P21 ProCurve 2848 Port 14 Admin-ES1-P14 Enclosure 3 Interconnect Module 1 Port 22 E3-IMB1-P22 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 84
From Label To Label Comment ProCurve 2848 Port 30 Admin-ES1-P30 Enclosure 2 Interconnect Module 2 Port 24 E2-IMB2-P24 ProCurve 2848 Port 31 Not Connected ProCurve 2848 Port 32 Not Connected ProCurve 2848 Port 33 Not Connected ProCurve 2848 Port 34 Admin-ES1-P34 Enclosure 3 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 85
the interconnect. Connections for the external control node and external InfiniBand switches are omitted if those components are not specified in the configuration. From ProCurve 2824 Port 1 ProCurve 2824 Port 2 ProCurve 2824 Port 3 ProCurve 2824 Port 4 ProCurve 2824 Port 5 ProCurve 2824 Port 6 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 86
From ProCurve 2824 Port 21 ProCurve 2824 Port 22 ProCurve 2824 Port 23 ProCurve 2824 Port 24 Label Admin-ES1-P21 Admin-ES1-P22 Admin-ES1-P23 Admin-ES1-P24 To Label Comment Enclosure 1 OA1 OA/ILO E1-OA1-ILO Optional External Control Node NIC1 Control- NIC1 Only Ppresent if control node is - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 87
From Label Enclosure 1 Interconnect Module 5/6 Port 7 E1-IMB5-P7 Enclosure 1 Interconnect Module 5/6 Port 8 E1-IMB5-P8 To N/A Control node InfiniBand HCA External InfiniBand Switch Wiring Label N/A Control-P1 Comment From Label IB 24 Port Switch Port 1 IB-SW1-P1 IB 24 Port Switch Port - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 88
From Label IB 24 Port Switch Port 18 IB-SW1-P18 IB 24 Port Switch Port 19 IB-SW1-P19 IB 24 Port Switch Port 20 IB-SW1-P20 IB 24 Port Switch Port 21 IB-SW1-P21 IB 24 Port Switch Port 22 IB-SW1-P22 IB 24 Port Switch Port 23 IB-SW1-P23 IB 24 Port Switch Port 24 IB-SW1-P24 To N/A - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 89
From Label Enclosure 1 Interconnect E1-IMB5-P8 Module 5/6 Port 8 To Label Enclosure 2 Interconnect Module 5/6 Port 8 E2-IMB5-P8 Control node InfiniBand HCA Control-P1 Comments Used if there is no rack-mount control node connected to the InfiniBand fabric Only used if the control node is - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 90
From Label IB 24 Port Switch Port 14 IB-SW1-P14 IB 24 Port Switch Port 15 IB-SW1-P15 IB 24 Port Switch Port 16 IB-SW1-P16 IB 24 Port Switch Port 17 IB-SW1-P17 IB 24 Port Switch Port 18 IB-SW1-P18 IB 24 Port Switch Port 19 IB-SW1-P19 IB 24 Port Switch Port 20 IB-SW1-P20 IB 24 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 91
From Label Enclosure 1 Interconnect Module 5/6 Port 5 E1-IMB5-P5 Enclosure 1 Interconnect Module 5/6 Port 6 E1-IMB5-P6 Enclosure 1 Interconnect Module 5/6 Port 7 E1-IMB5-P7 Enclosure 1 Interconnect E1-IMB5-P8 Module 5/6 Port 8 To Label Enclosure 1 Interconnect Module 7/8 Port 5 E1-IMB7- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 92
From Label IB 24 Port Switch Port 13 IB-SW1-P13 IB 24 Port Switch Port 14 IB-SW1-P14 IB 24 Port Switch Port 15 IB-SW1-P15 IB 24 Port Switch Port 16 IB-SW1-P16 IB 24 Port Switch Port 17 IB-SW1-P17 IB 24 Port Switch Port 18 IB-SW1-P18 IB 24 Port Switch Port 19 IB-SW1-P19 IB 24 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 93
From Label IB Switch 1 24 Port Switch Port 4 IB-SW1-P4 IB Switch 1 24 Port Switch Port 5 IB-SW1-P5 IB Switch 1 24 Port Switch Port 6 IB-SW1-P6 IB Switch 1 24 Port Switch Port 7 IB-SW1-P7 IB Switch 1 24 Port Switch Port 8 IB-SW1-P8 IB Switch 1 24 Port Switch Port 9 IB-SW1-P9 IB Switch 1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 94
Wiring for Second External InfiniBand Switch From Label IB Switch 2 24 Port Switch Port 1 IB-SW2-P1 IB Switch 2 24 Port Switch Port 2 IB-SW2-P2 IB Switch 2 24 Port Switch Port 3 IB-SW2-P3 IB Switch 2 24 Port Switch Port 4 IB-SW2-P4 IB Switch 2 24 Port Switch Port 5 IB-SW2-P5 IB Switch 2 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 95
From Label IB Switch 2 24 Port Switch Port 22 IB-SW2-P22 IB Switch 2 24 Port Switch Port 23 IB-SW2-P23 IB Switch 2 24 Port Switch Port 24 IB-SW2-P24 To Label Enclosure 3 Interconnect Module 7/8 Port 6 E3-IMB7-P6 Enclosure 3 Interconnect Module 7/8 Port 7 E3-IMB7-P7 Enclosure 3 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 96
From Label Enclosure 1 Interconnect Module 5/6 Port 12 Enclosure 1 Interconnect Module 5/6 Port 13 Enclosure 1 Interconnect Module 5/6 Port 14 Enclosure 1 Interconnect Module 5/6 Port 15 Enclosure 1 Interconnect Module 5/6 Port 16 To N/A N/A N/A N/A N/A Label N/A Comment N/A N/A N/A N/A - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 97
From IB 24 Port Switch Port 14 IB 24 Port Switch Port 15 IB 24 Port Switch Port 16 IB 24 Port Switch Port 17 IB 24 Port Switch Port 18 IB 24 Port Switch Port 19 IB 24 Port Switch Port 20 IB 24 Port Switch Port 21 IB 24 Port Switch Port 22 IB 24 Port Switch Port 23 IB 24 Port Switch Port 24 Label IB - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 98
From Label Enclosure 1 Interconnect Module 5/6 Port 5 E1-IMB5-P5 Enclosure 1 Interconnect Module 5/6 Port 6 E1-IMB5-P6 Enclosure 1 Interconnect Module 5/6 Port 7 E1-IMB5-P7 Enclosure 1 Interconnect Module 5/6 Port 8 E1-IMB5-P8 Enclosure 1 Interconnect Module 5/6 Port 9 E1-IMB5-P9 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 99
Note: For one c7000 enclosure wiring tables, see Section D.13. Wiring for the First External InfiniBand Switch (IB-SW1) From Label IB Switch 1 24 Port Switch Port 1 IB-SW1-P1 IB Switch 1 24 Port Switch Port 2 IB-SW1-P2 IB Switch 1 24 Port Switch Port 3 IB-SW1-P3 IB Switch 1 24 Port - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 100
From Label IB Switch 1 24 Port Switch Port 21 IB-SW1-P21 IB Switch 1 24 Port Switch Port 22 IB-SW1-P22 IB Switch 1 24 Port Switch Port 23 IB-SW1-P23 IB Switch 1 24 Port Switch Port 24 IB-SW1-P24 To Label Enclosure 3 Interconnect Module 5/6 Port 5 E3-IMB5-P5 Enclosure 3 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 101
From Label IB Switch 2 24 Port Switch Port 16 IB-SW2-P16 IB Switch 2 24 Port Switch Port 17 IB-SW2-P17 IB Switch 2 24 Port Switch Port 18 IB-SW2-P18 IB Switch 2 24 Port Switch Port 19 IB-SW2-P19 IB Switch 2 24 Port Switch Port 20 IB-SW2-P20 IB Switch 2 24 Port Switch Port 21 IB- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 102
From Label To Label Enclosure 1 Interconnect Module 5/6 Port 6 E1-IMB5-P6 Enclosure 1 Interconnect Module 7/8 Port 6 E1-IMB7-P6 Enclosure 1 Interconnect Module 5/6 Port 7 E1-IMB5-P7 Enclosure 1 Interconnect Module 7/8 Port 7 E1-IMB7-P7 Enclosure 1 Interconnect Module 5/6 Port 8 E1- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 103
Wiring Table for the First InfiniBand Switch (IB-SW1) From Label IB 24 Port Switch 1 Port 1 IB-SW1-P1 IB 24 Port Switch 1 Port 2 IB-SW1-P2 IB 24 Port Switch 1 Port 3 IB-SW1-P3 IB 24 Port Switch 1 Port 4 IB-SW1-P4 IB 24 Port Switch 1 Port 5 IB-SW1-P5 IB 24 Port Switch 1 Port 6 IB- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 104
From Label To IB 24 Port Switch 1 Port 23 IB-SW1-P23 N/A Label N/A IB 24 Port Switch 1 Port 24 IB-SW1-P24 Control node InfiniBand HCA Control-P1 Comment Only used if the control node is a rack-mount server connected to the InfiniBand fabric Wiring table for the Second InfiniBand Switch - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 105
From Label To IB 24 Port Switch 2 Port 20 IB-SW2-P20 N/A IB 24 Port Switch 2 Port 21 IB-SW2-P21 N/A IB 24 Port Switch 2 Port 22 IB-SW2-P22 N/A IB 24 Port Switch 2 Port 23 IB-SW2-P23 N/A Label N/A N/A N/A N/A IB 24 Port Switch 2 Port 24 IB-SW2-P24 Control node InfiniBand HCA - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 106
From Label IB Switch 1 24 Port Switch Port 11 IB-SW1-P11 IB Switch 1 24 Port Switch Port 12 IB-SW1-P12 IB Switch 1 24 Port Switch Port 13 IB-SW1-P13 IB Switch 1 24 Port Switch Port 14 IB-SW1-P14 IB Switch 1 24 Port Switch Port 15 IB-SW1-P15 IB Switch 1 24 Port Switch Port 16 IB- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 107
From Label IB Switch 2 24 Port Switch Port 8 IB-SW2-P8 IB Switch 2 24 Port Switch Port 9 IB-SW2-P9 IB Switch 2 24 Port Switch Port 10 IB-SW2-P10 IB Switch 2 24 Port Switch Port 11 IB-SW2-P11 IB Switch 2 24 Port Switch Port 12 IB-SW2-P12 IB Switch 2 24 Port Switch Port 13 IB-SW2- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 108
From Label IB Switch 3 24 Port Switch Port 5 IB-SW3-P5 IB Switch 3 24 Port Switch Port 6 IB-SW3-P6 IB Switch 3 24 Port Switch Port 7 IB-SW3-P7 IB Switch 3 24 Port Switch Port 8 IB-SW3-P8 IB Switch 3 24 Port Switch Port 9 IB-SW3-P9 IB Switch 3 24 Port Switch Port 10 IB-SW3-P10 IB - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 109
Wiring Table for the Fourth InfiniBand Switch (IB-SW4) From Label IB Switch 4 24 Port Switch Port 1 IB-SW4-P1 IB Switch 4 24 Port Switch Port 2 IB-SW4-P2 IB Switch 4 24 Port Switch Port 3 IB-SW4-P3 IB Switch 4 24 Port Switch Port 4 IB-SW4-P4 IB Switch 4 24 Port Switch Port 5 IB-SW4- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 110
From Label IB Switch 4 24 Port Switch Port 22 IB-SW4-P22 IB Switch 4 24 Port Switch Port 23 IB-SW4-P23 IB Switch 4 24 Port Switch Port 24 IB-SW4-P24 To Label Enclosure 3 Interconnect Module 7/8 Port 14 E3-IMB7-P14 Enclosure 3 Interconnect Module 7/8 Port 15 E3-IMB7-P15 Enclosure 3 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 111
E Configuration Rules for CPE BladeSystems This appendix provides the configuration and power distribution rules for CPE BladeSystem configurations. The following sections discuss: • CP Workgroup System device and interconnect bays (see Section E.1) • CP Workgroup System fan bays (see Section E.2) - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 112
second, additional power strip is required for configurations that have an externally managed InfiniBand switch. CPE Configuration1 International North America CP Workgroup System basic One 32A PDU One 24A PDU CP Workgroup System with external One 32A PDU control node and TFT7600 Two 24A - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 113
Fan Bays 4, 5, 9, 10 3, 4, 5, 8, 9, 10 1, 2, 4, 5, 6, 7, 9, 10 E.6 CPE with c7000 Power Distribution Rules CPE BladeSystem with c7000 enclosure configurations support redundant power supplies (N+1) in the c7000 enclosure. In order to meet power requirements, each enclosure is configured with up to - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 114
Figure E-1 c7000 PSUs HP Cluster Platform Express supports high-voltage power connections (200V-240V). Power requirements can be met by using up to eight single phase PDU's per enclosure as shown in the - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 115
F Cabling Tables for Rack-Mountable Servers This appendix provides the following cabling tables: • Ethernet and Gigabit Ethernet network cabling tables for rack-mountable servers (see Section F.1). • InfiniBand cabling tables for rack-mountable servers (see Section F.2). F.1 Ethernet and Gigabit - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 116
From Label To Label Cable ProCurve 2824 Port 13 Admin-ES1-P13 Enclosure 3 Interconnect Module 1 Port 21 E3-IMB1-P21 ProCurve 2824 Port 14 Admin-ES1-P14 Enclosure 3 Interconnect Module 1 Port 22 E3-IMB1-P22 Only present if interconnect is GigE ProCurve 2824 Port 15 Admin-ES1-P15 Enclosure 3 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 117
From ProCurve 2824 Port 15 ProCurve 2824 Port 16 ProCurve 2824 Port 17 ProCurve 2824 Port 18 ProCurve 2824 Port 19 ProCurve 2824 Port 20 ProCurve 2824 Port 21 ProCurve 2824 Port 22 ProCurve 2824 Port 23 ProCurve 2824 Port 24 Label Admin-ES1-P15 Admin-ES1-P16 Admin-ES1-P17 Admin-ES1-P18 Admin-ES1- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 118
From Label To Label Cable ProCurve 2848 Port 21 Admin-ES1-P21 Embedded NIC1 (eth0) in Node 17 Server17-NIC1 C7533A ProCurve 2848 Port 22 Admin-ES1-P22 Embedded NIC1 (eth0) in Node 16 Server16-NIC1 C7533A ProCurve 2848 Port 23 Not connected ProCurve 2848 Port 24 Not connected ProCurve 2848 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 119
F.1.4 In-Band Network Switch Administrative Network for 1-20 Nodes Using the ProCurve 2626 Gigabit Ethernet Switch The following table shows the in-band network switch console network for 1-20 nodes, using the ProCurve 2626 Gigabit Ethernet network switch: From ProCurve 2626 Port 1 ProCurve 2626 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 120
F.1.5 In-Band Network Switch Administrative Network for 21-32 Nodes Using the ProCurve 2650 Gigabit Ethernet Switch The following table shows the in-band network switch console network for 21-32 nodes, using the ProCurve 2650 Gigabit Ethernet network switch: From Label To ProCurve 2650 Port 1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 121
to recable a dismantled cluster using new, unlabeled cables. F.2.1.1 Using the Cabling Tables From the cabling tables listed in the appendices of this guide, select the appropriate cabling table that matches the configuration of your cluster. Verify the tables by comparing the port addresses in the - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 122
port, such as IB-SW1-P24 to IB-SW2-P24. F.2.2 Using a Single ISR 9024 Interconnect to Support up to 24 Nodes The following table shows the links for a cluster using a single ISR 9024 interconnect to support up to 24 nodes. Origin IB-SW1-P01 IB-SW1-P02 IB-SW1-P03 IB-SW1 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 123
-32 Nodes The following table shows the links for a cluster using two ISR 9024 interconnects, and supporting up to 25-32 nodes, back-to-back 2:1: Origin IB-SW1-P01 IB-SW1-P02 IB-SW1-P03 IB-SW1-P04 IB-SW1-P05 IB- - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 124
Origin IB-SW2-P10 IB-SW2-P11 IB-SW2-P12 IB-SW2-P13 IB-SW2-P14 IB-SW2-P15 IB-SW2-P16 IB-SW2-P17 IB-SW2-P18 IB-SW2-P19 IB-SW2-P20 IB-SW2-P21 IB-SW2-P22 IB-SW2-P23 IB-SW2-P24 Primary Destination Secondary Destination IB-SW1-P10 IB-SW1-P11 IB-SW1-P12 Server7-IB-P0 Server8-IB-P0 Server6-IB-P0 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 125
Index Symbols 22U cabinet configuration BladeSystem, 43 rack-mountable servers, 56 22U configuration example BladeSystem with c3000 enclosure, 38 BladeSystem with one enclosure, 48 BladeSystem with two enclosures, 48 22U configuration example - without external control node BladeSystem with c3000 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 126
, 10 installation Rack-mountable servers, 58 integrated lights out (see iLO) intended audience, 9 ISR 9024, 56, 57 component address (number), 121 federated interconnects, 122 support for 25-32 nodes, 123 support for up to 24, 122 ISR 9024 interconnect (see ISR 9024) K KVM, 25, 57 switch, 56, 57 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 127
KVM console switch, 56 L LAN, 26 (see also local area network) LED link state, 24 power, 50, 58 legal notices and trademarks, 2 link, 25 (see also cable) status LED, 24 local I/O cable, 52 log-in Web site, 10 M management port port, 25 message passing interface, 56, 57 MPI, 56, 57 (see also message - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 128
operating system, 41, 51, 59 software management accessing server with KVM, 51 BladeSystem requirements, 51 Start-up (see installation) straps, 23 switch console, 13 ethernet, 56, 57 KVM, 56, 57 syntax wiring, 61 T tables Ethernet cabling, 76, 116, 119 InfiniBand cabling, 122 testing, 58 TFT7600, 25 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 129
129 - HP Cluster Platform Express v2010 | Workgroup System and Cluster Platform Expres - Page 130
*A-CPCPE-1E* Printed in the US
HP Cluster Platform Workgroup System
and Cluster Platform Express
Overview and Hardware Installation Guide
HP Part Number: A-CPCPE-1E
Published: February 2009