HP Cluster Platform Express v2010 Workgroup System and Cluster Platform Expres - Page 33
CPE BladeSystem Configurations with Double-Density Server Blade Control Node
View all HP Cluster Platform Express v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 33 highlights
Note: Only one connection from each HP GbE2c switch to the HP ProCurve 2824 switch is required if the optional InfiniBand network is present. 1.4.6.6 CPE BladeSystem Configurations with Double-Density Server Blade Control Node Figure 1-17 shows a connections to an external network for configurations of c7000 enclosures with a double-density server blade control node. Figure 1-17 shows two c7000 enclosures, but the connection scheme applies to all c7000 based configurations with a double-density server blade control node. The control node is always installed in c7000 enclosure 1 which is the bottom enclosure in the rack. Figure 1-17 CPE BladeSystem Configurations with Double-Density Server Blade Control Node 2 9 4 8 11 5 1 6 3 6 7 6 12 10 13 14 The following list describes the callouts shown in Figure 1-17: 1. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 2 (IMB2) of the first HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 2. HP ProCurve 2824 switch 3. Four connections from an HP GbE2c switch installed in IMB2 of the first HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 4. Four connections from an HP GbE2c switch installed in IMB1 of the second HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 1.4 CPE Architecture Overview 33