HP Cluster Platform Express v2010 Workgroup System and Cluster Platform Expres - Page 29

CPE BladeSystem Configurations with a Rack-Mountable Server Control Node

Page 29 highlights

Figure 1-14 CPE BladeSystem Configurations with a Rack-Mountable Server Control Node 11 2 3 2 8 6 12 9 4 6 1 5 10 7 6 The following list describes the callouts in Figure 1-14: 1. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1) of the first HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 2. HP ProCurve 2824 switch 3. Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1) of the second HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following note) 4. HP GbE2c Gigabit Ethernet switch installed in IMB1 of the first HP BladeSystem c7000 enclosure 5. HP GbE2c Gigabit Ethernet switch installed in IMB1 of the second HP BladeSystem c7000 enclosure 6. Connection from the Onboard Administrator's (OA) external link to an administrative switch (HP ProCurve 2824 switch) 7. Optional connection from the first c7000 enclosure's OA uplink to the second c7000 enclosure's OA downlink 8. Connection from the external control NIC1 port to the administrative switch (such as a ProCurve 2824) 9. Rack-mountable server control node (also referred to as an external control node) 1.4 CPE Architecture Overview 29

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130

Figure 1-14 CPE BladeSystem Configurations with a Rack-Mountable Server Control Node
6
6
1
3
11
6
2
12
9
7
8
5
4
10
The following list describes the callouts in
Figure 1-14
:
1.
Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1)
of the first HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the following
note)
2.
HP ProCurve 2824 switch
3.
Four connections from an HP GbE2c switch installed in Interconnect Module Bay 1 (IMB1)
of the second HP BladeSystem c7000 enclosure to an HP ProCurve 2824 switch (see the
following note)
4.
HP GbE2c Gigabit Ethernet switch installed in IMB1 of the first HP BladeSystem c7000
enclosure
5.
HP GbE2c Gigabit Ethernet switch installed in IMB1 of the second HP BladeSystem c7000
enclosure
6.
Connection from the Onboard Administrator's (OA) external link to an administrative switch
(HP ProCurve 2824 switch)
7.
Optional connection from the first c7000 enclosure's OA uplink to the second c7000 enclosure's
OA downlink
8.
Connection from the external control NIC1 port to the administrative switch (such as a
ProCurve 2824)
9.
Rack-mountable server control node (also referred to as an external control node)
1.4 CPE Architecture Overview
29