Dell PowerEdge R750xa EMC Installation and Service Manual - Page 125

Installing the VGA port, Removing the VGA port

Page 125 highlights

Figure 128. Removing the VGA port 5. Install the filler bracket if not replacing the VGA port. Next steps 1. Replace the VGA port. Installing the VGA port The procedure to install VGA port on Riser 2 is same. Prerequisites 1. Follow the safety guidelines listed in the Safety instructions. 2. Follow the procedure listed in Before working inside your system. 3. Remove the air shroud. NOTE: VGA port is supported only in slot 4, slot 5 or slot 6 of the expansion card riser. Steps 1. Open the latch on the expansion card riser and remove the filler bracket from the expansion card riser. 2. Slide the VGA port into the expansion card riser and close the latch. Installing and removing system components 125

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190

Figure 128. Removing the VGA port
5.
Install the filler bracket if not replacing the VGA port.
Next steps
1.
Replace the VGA port
.
Installing the VGA port
The procedure to install VGA port on Riser 2 is same.
Prerequisites
1.
Follow the safety guidelines listed in the
Safety instructions
.
2.
Follow the procedure listed in
Before working inside your system
.
3.
Remove the air shroud
.
NOTE:
VGA port is supported only in slot 4, slot 5 or slot 6 of the expansion card riser.
Steps
1.
Open the latch on the expansion card riser and remove the filler bracket from the expansion card riser.
2.
Slide the VGA port into the expansion card riser and close the latch.
Installing and removing system components
125