IBM 436854u Service Guide - Page 113
Installing the hot-swap power supply cage, supply
UPC - 883436026772
View all IBM 436854u manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 113 highlights
Installing the hot-swap power supply cage This procedure applies only to server models that have hot-swap power-supplies. To install the hot-swap power supply cage, complete the following steps: 1. Place the power-supply cage into the chassis and slide it toward the rear of the server until the retaining clips engage the top of the chassis. 2. Install the four screws that secure the power-supply cage to the chassis. 3. Connect the cables from the power-supply cage to the system board and all internal components. 4. Reinstall both hot-swap power supplies (see "Installing a hot-swap power supply" on page 74). 5. Install the side cover (see "Installing the side cover" on page 53). 6. Lock the side cover if you unlocked it during removal. 7. Reconnect the external cables and power cords; then, turn on the attached devices and turn on the server. Chapter 4. Removing and replacing server components 95