Lantronix SLB Lantronix SLB - User Guide - Page 300

Port Connections, Appendix C: Safety Information, SLB - Branch Office Manager User Guide

Page 300 highlights

Appendix C: Safety Information Rack If rack mounted SLBs are installed in a closed or multi-unit rack assembly, they may require further evaluation by Certification Agencies. The following items must be considered:  Do not install the SLB in a rack in such a way that a hazardous stability condition results because of uneven loading. A drop or fall could cause injury.  The ambient temperature (Tma) inside the rack may be greater than the room ambient temperature. Make sure to install the SLB in an environment with an ambient temperature less than the maximum operating temperature of the SLB. (See Technical Specifications on page 30.)  Install the equipment in a rack in such a way that the amount of airflow required for safe operation of the equipment is not compromised.  Mount the equipment in the rack so that a hazardous condition is not achieved due to uneven mechanical loading.  Maintain reliable earthing of rack-mounted equipment. Give particular attention to supply connections other than direct connections to the branch circuit (e.g. use of power strips).  Before operating the SLB, make sure the SLB is secured to the rack. Port Connections  Only connect the network port to an Ethernet network that supports 10Base-T/100Base-T.  Only connect device ports to equipment with serial ports that support EIA-232 (formerly RS- 232C).  Only connect the console port to equipment with serial ports that support EIA-232 (formerly RS-232C). SLB - Branch Office Manager User Guide 300

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308

Appendix C: Safety Information
SLB - Branch Office Manager User Guide
300
Rack
If rack mounted SLBs are installed in a closed or multi-unit rack assembly, they may require further
evaluation by Certification Agencies. The following items must be considered:
Do not install the SLB in a rack in such a way that a hazardous stability condition results
because of uneven loading. A drop or fall could cause injury.
The ambient temperature (Tma) inside the rack may be greater than the room ambient
temperature. Make sure to install the SLB in an environment with an ambient temperature less
than the maximum operating temperature of the SLB. (See
Technical Specifications on page
30
.)
Install the equipment in a rack in such a way that the amount of airflow required for safe
operation of the equipment is not compromised.
Mount the equipment in the rack so that a hazardous condition is not achieved due to uneven
mechanical loading.
Maintain reliable earthing of rack-mounted equipment. Give particular attention to supply
connections other than direct connections to the branch circuit (e.g. use of power strips).
Before operating the SLB, make sure the SLB is secured to the rack.
Port Connections
Only connect the network port to an Ethernet network that supports 10Base-T/100Base-T.
Only connect device ports to equipment with serial ports that support EIA-232 (formerly RS-
232C).
Only connect the console port to equipment with serial ports that support EIA-232 (formerly
RS-232C).