Brother International HS-5300 Service Manual - Page 93
frame, position, Switch, lever, Projection, holder, Cover, Taptite, M3X16
View all Brother International HS-5300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 93 highlights
4.20.2 Cam Home Position SW ASSY (1) Loosen the screw (do NOT remove it) from the CR I pulley holder ASSY through the hole on the right front side of the Main frame ASSY. Push the CR I pulley holder ASSY toward the Carriage motor and remove the Timing belt from the pulley of the Carriage motor. Refer to fig. 4.96. (2) Remove the two screws on the left of the Carriage beam ASSY and remove the Carriage motor ASSY. (3) Release the hook of the gear holder to remove the Cam position SW ASSY from the Gear unit. Refer to fig. 4.107. Hook Main frame ASSY Cam home position SW ASSY Switch lever Projection Gear holder Fig. 4.63 Note When reassembling the Cam home position SW ASSY, make sure that the projection of the gear is underneath the switch lever. 4.20.3 Cover Open SW ASSY (1) Remove the Cover open lever ASSY from the Main frame ASSY. (2) Remove the screw and remove the Cover open SW ASSY. Note: When reassembling, run the harness through the hole in the Main cover. Cover open SW ASSY Cover open lever ASSY 'Ca r. b Fig. 4.64 III-41 Taptite, bind B M3X16