Dell PowerConnect J-8216 Hardware Guide - Page 79
Site Preparation, Site Preparation Checklist for a J-EX8200 Switch
View all Dell PowerConnect J-8216 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 79 highlights
CHAPTER 4 Site Preparation • Site Preparation Checklist for a J-EX8200 Switch on page 63 • General Site Guidelines for J-EX Series Switches on page 64 • Site Electrical Wiring Guidelines for J-EX Series Switches on page 65 • Environmental Requirements and Specifications for J-EX Series Switches on page 66 Site Preparation Checklist for a J-EX8200 Switch The checklist in Table 30 on page 63 summarizes the tasks you need to perform to prepare a site for installing a J-EX8200 switch. Table 30: Site Preparation Checklist Item or Task For More Information Performed By Date Environment Verify that environmental factors such as temperature and humidity do not exceed switch tolerances. "Environmental Requirements and Specifications for J-EX Series Switches" on page 66 Power Measure distance between external power sources and switch installation site. Calculate the power consumption and requirements. "AC Power Specifications for J-EX8200 Switches" on page 81 "Power Requirements for J-EX8216 Switch Components" on page 82 "Calculating Power Requirements for a J-EX8216 Switch" on page 85 "Calculating the J-EX8200 Switch Fiber-Optic Cable Power Budget" on page 91 "Calculating the J-EX8200 Switch Fiber-Optic Cable Power Margin" on page 92 63