Dell PowerConnect J-8216 Hardware Guide - Page 89

Clearance Requirements for Airflow and Hardware Maintenance for a J-EX8216 Switch

Page 89 highlights

Chapter 5: Rack and Cabinet Requirements • Rack Requirements for a J-EX8216 Switch on page 69 • Chassis Physical Specifications of a J-EX8216 Switch on page 9 Clearance Requirements for Airflow and Hardware Maintenance for a J-EX8216 Switch When planning the site for installing a J-EX8216 switch, you must allow sufficient clearance around the switch. NOTE: To manage airflow in a hot-aisle--cold-aisle data center setup, you might want to use the customized rack solution for J-EX8200 switches offered by Chatsworth Products, Inc. Follow these clearance requirements: • Allow at least 6 in. (15.2 cm) of clearance on each side of the chassis. For the cooling system to function properly, the airflow around the chassis must be unrestricted. See Figure 31 on page 73 and Figure 32 on page 74. NOTE: Do not block the air intake below the power supply slots. Figure 31: Airflow Through the J-EX8216 Switch Chassis 73

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270

Rack Requirements for a J-EX8216 Switch on page 69
Chassis Physical Specifications of a J-EX8216 Switch on page 9
Clearance Requirements for Airflow and Hardware Maintenance for a J-EX8216 Switch
When planning the site for installing a J-EX8216 switch, you must allow sufficient clearance
around the switch.
NOTE:
To manage airflow in a hot-aisle--cold-aisle data center setup, you
might want to use the customized rack solution for J-EX8200 switches offered
by Chatsworth Products, Inc.
Follow these clearance requirements:
Allow at least 6 in. (15.2 cm) of clearance on each side of the chassis. For the cooling
system to function properly, the airflow around the chassis must be unrestricted. See
Figure 31 on page 73 and Figure 32 on page 74.
NOTE:
Do not block the air intake below the power supply slots.
Figure 31: Airflow Through the J-EX8216 Switch Chassis
73
Chapter 5: Rack and Cabinet Requirements