HP Cluster Platform Interconnects v2010 HP Cluster Platform InfiniBand Interco - Page 136
ISR 9024S/D-M, Installing and Maintaining
View all HP Cluster Platform Interconnects v2010 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 136 highlights
ISR 9024 S/D cooling, 45 DB-9 adapter, 40 externally managed, 39 front panel, externally managed, 41 installing PSU, 46 internally managed, 39 master mode, 40 (see also internally managed) overview, 39 rack kit, 44 slave mode, 40 (see also externally managed) specifications, 113 unpacking, 43 ISR 9024D-M reset button, 41 ISR 9024S/D-M management card, 41 ISR 9024-M front panel, internally managed, 40 ISR 9096 administrative cabling connections, 90 architecture, 50 backplane, 51 building blocks, 50 cabling procedure, 87 fabric board, 50 fan units, 51 features, 49 firmware, 51 identifying, 23 Installing and maintaining, 49 management board, 50 midplane, 50 multi-protocol, 24 performance management agent, 52 post-installation, 67 PSU, 50, 51 rack mount procedure, 60 rack mounting, 58 repacking, 58 reset button, 50 resetting, 52 sCTRL, 50 sFB-4, 51 sFU-8, 50, 51 sLB-24, 50, 51 sMB, 51 specifications, 117 sRBD, 50, 51 start-up, 67 startup check, 107 subnet management agent, 52 unpacking, 55 ISR 9096 management, 26 (see also management) ISR 9288 administrative cabling connections, 90 136 Index architecture, 50 backplane, 51 building blocks, 50 cable management hooks, 62 cabling clamps, 63 cabling procedure, 88 control panels, 52 fabric board, 50 fan units, 51 FCR, swapping, 78 features, 49 firmware, 51 front view, 57 FRU, 71 handling boards, 71 identifying, 24 Installing and Maintaining, 49 IPR, swapping, 77 management board, 50 midplane, 50 multi protocol, 25 network management, 50 overview, 49 performance management agent, 52 post-installation, 67 PSU, 50, 51 PSU, swapping, 76 rack mount procedure, 60 rack mounting, 58 rear view, 57 repacking, 58 reset button, 50 reset buttons, 52 resetting, 52 sCTRL, 50 sCTRL, swapping, 81 sFB-12, 51 sFB-12, swapping, 72 sFU-4, 51 sFU-4, swapping, 82 sFU-8, 50, 51 sFU-8, swapping, 83 sLB-24, 51 sLB-24, swapping, 73 sMB, 51 sMB, swapping, 75 specifications, 119 sRBD, 50, 51 sRBD configurations, 65 sRBD, swapping, 77, 80 start-up, 67 startup check, 107 subnet management agent, 52 unpacking, 53 verifying shipment, 56 ISR 9288 management, 26 (see also management) ISR 9XXX configurations, 63