HP ProLiant DL170e HP ProLiant DL170e G6 Server Maintenance and Service Guide - Page 123
Removal and replacement procedures
![]() |
View all HP ProLiant DL170e manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 123 highlights
Figure 122 Installing the Adapter Board Bracket on the System Board Tray NOTE: When two smart array P410 controller boards are installed in the 2U PCIe cage assembly, an additional adapter board needs to be installed on the adapter board bracket as shown in Figure 135. This provides a location for the additional smart array P410 controller board cables to plug into. 25. Align the 2U upper sheet metal air baffle to the adapter board bracket by the 2 screw holes. Make sure that the U Type and Right Exit Mini SAS to Mini SAS cables pass through the open hole of the 2U upper sheet metal air baffle. 26. Install the 2 screws to install the 2U upper sheet metal air baffle on the adapter board bracket. Figure 123 Installing the 2U Upper Sheet Metal Air Baffle Removal and replacement procedures 123
![](/manual_guide/products/hewlettpackard-proliant-dl170e-hp-proliant-dl170e-g6-server-maintenance-service-guide-4b5be1d/123.png)